prefab houses made in china
prefab houses made in china
prefab houses made in china
prefab houses made in china
prefab houses made in china

prefab houses made in china

USD $50 - $70 /Square Meter

Min.Order:60 Square Meters

Supply Ability:
6000 Square Meter / Square Meters per Month
Port:
QingDao
Payment Terms:
T/T Credit Card

Quick Details View All >

Place of Origin:
Henan, China
Brand Name:
canglong
Model Number:
No29
Material:
Steel
Use:
Carport, Hotel, House, Other, Office, Shop, Villa, Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box,Guard House, Shop, Villa

Henan Province Canglong Steel Structure Engineering Co., Ltd.

Business Type: Trading Company
Zhengzhou Henan China
Main Products: steel structure warehouse ,steel structure workshop ,C/ Z purlin/H steel ,cold storage ,prefabricated house/home

Product Details

 

Company Information

Who Are We ?

Thank you for your interest in Henan CangLong Steel Structures co,.ltd ,  We are a family owned business and have been in operation since 2007, specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..

Why is CangLong Steel Structures the Right Choice?

Your investment is an important decision and should be realized through a financially stable company.  Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.


 

WHY US ?

The Edge

 Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective and economic 

 engineering and manufacturing methods enable us to offer the most competitive prices in the industry.

Fast Quotations

 Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced software we use.

Fast Delivery 

  We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks. 
 Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock position, weather etc).
Site Supervision 

  A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
  Any problems that arise are quickly dealt with to minimise any delays. 
  Safety on site is also made a priority.

 

 

Product Overviews

prefab houses made in chinaprefab houses made in chinaprefab houses made in chinaprefab houses made in china

     rock wall panels                            rock wool                               galvanized piper                      roof panels

prefab houses made in chinaprefab houses made in chinaprefab houses made in chinaprefab houses made in china

     accessories                              screws                                            revites                             villas frame

 

 

Packaging & Shipping

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) the lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) at the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) no rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) the member to the construction site, timely organization of unloading, stacking area.

(6) the crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

prefab houses made in chinaprefab houses made in chinaprefab houses made in chinaprefab houses made in china

prefab houses made in chinaprefab houses made in chinaprefab houses made in china 

 

Buying Guides

1.Dimension :Length , width, height, eave height , roof pitch .

2.Doors and windows :dimension , quantity , where to put them.

3.Local climate : Wind speed , snow load ,etc

4.insulation material :sandwich panel or steel sheet

5.Crane beam :Do you need crane beam &tons? inside the steel structure or outside ?

6.Is there any materials that are not allowed to imported into the country where the structure is planning to use ?

7.What is the founctions of the workshop? we must consider the wind and lighting inside.

 

Contact us

Our company with factory is located in Zhengzhou city , Henan province . Sincerely invite you to visit our company ,you will be clear to our products qulity  control of production process ! Welcome you to place order with our company !!

   Ada Gao

     Sales Manager

    Tel:+86 15981850388

 

 

 

 

Contact Supplier

Ms. Ada Gao General Manager Chat Now
Telephone
86-0371-55888285
Mobile
15981850388
Fax
86-0371-55888285
Address
Go ahead east 500 meters from 107 National RdXinZheng crossing Zhengzhou City.Henan China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Real Estate > Prefab Houses
Categories
Hi~