High quality Luxury prefab new buildings materials light steel villa
USD $60 - $80 /Square Meter
Min.Order:120 Square Meters
Henan Province Canglong Steel Structure Engineering Co., Ltd.
A.steel structure material:
Wall thermal insulation material: steel structure + + hanging plate / light cement board
Roof: asphalt tile / color decorative tile + steel structure +OSB+ moisture+proof breathable film + thermal insulation material
The steel structure: C type light steel keel
B.performance of light steel structure villa:
1, the anti anti typhoon, earthquake;
2.Anti seismic level eight or above and can resist eleven typhoons (wind speed 140km/ hours).Anti rust and corrosion:
3, fire protection;
4, insulation;
5, Protect environment
6, sound insulation performance is good
7, the use of more space
Gypsum board Reinforced network expansion glass wool OSB boards
Asphalt roofing tile Plastic extruded board Down water systerm Steel frame
Gypsum board Respiratory paper Cement board
1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;
2. Reasonablly selection of welding parameters and order to prevent crack;
3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;
4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;
5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.
Attached: welding process parameters
welding process parameters
Materals(mm) | Electrode diameter (mm) | Welding current(A) | Welding voltage(V) | Welding speed(m/min) |
<10 | Ø3.2 | 200-250 | 30-38 | 0.2-0.3 |
10-20 | Ø4.0 | 200-250 | 30-38 | 0.15-0.25 |
>30 | Ø4.0 | 320-350 | 30-38 | 0.3-0.5 |
Bellow materials are general used in steel buildings , but we often customized each type depend on clients requirment .
Item Name | Materials Characteristics | Material Grade | Surface Treatment |
Steel Column | H shape,Box,Steel Pipe,Hot tolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel beam | H shape,Box,Steel Pipe,Hot tolled sheet | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Bracing | Steel Rod,Steel Pipe,Angle Steel | Q235B,Q345B | Paint or Hot dip Galvanized |
Steel Purlin | C or Z purlins(Thickness1.8mm~3.0mm) | Q235B,Q345B | Hot dip Galvanized |
External Wall panels,Roof panels | Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU. | Galvanized Steel+Painting | Alu-zin 150g,Fluorocarbon pain |
Steel buildings Door | Slidding or Rolling door | Steel or Aluminum sheet | Paint or Hot dip galvanized |
Steel buildings Windows | Aluminum alloy-Glass,Aluminum alloy-shutter | T=1.0-2.0mm | Alloy |
Skylighting panels | FRP T=1.5mm-1.8mm | Coefficient of thermal expansion:2.2x10-5/cm | Light Tranmitar 85% |
Ventilator | Turbine ventilator on a ridge | Steel,Stainless steel ,PC | Paint or Hot dip Galvanized |
Gutter | Galvanized steel plate,Stainless steel plate | T=2.0mm | Hot dip galvanized |
Downpipe | PVC pipe,color steelpipe Y=0.5mm | Dia110mm | paint |
Hight Bolt | Ordinary ,High strength | 10.9S,4.8S | Hot dip galvanized,Steel |
Ground bolts | Steel RodM24,M27,M30,M33,M39,M42 | 10.9S | Steel |
Who Are We ?
We are professtional factory with operation since 2007, who is specializing in post frame steel buildings. Our individually engineered permanent structures are the best choice for customers requiring speed of construction and economy coupled with aesthetic value. Our buildings are ideal for residential, commercial , agricultural ,industrial and chemical factories ,warehouses & stores , hospitals & clinics,multi-storey buildings , supermarkets ..
Why is CangLong Steel Structures the Right Choice?
Your investment is an important decision and should be realized through a financially stable company. Our deep community roots and stout economic strength gives us an exceptional advantage in hiring experienced professionals who will complete your project to your expectations.
The Edge
Competitive Prices Our production capacity (approximately 20000 metric tons annually) together with effective
and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced
software we use.
Fast Delivery
(1)We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks.
(2)Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock
position, weather etc).
Site Supervision
(1)A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
(2)Any problems that arise are quickly dealt with to minimise any delays.
(3)Safety on site is also made a priority.
1. Common type of the industrial steel structure building/Prefabricated house?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request.
2. What’s the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3. How about the delivery time?
Reply: Usually,within 20-25 days after the order confirmed, also depends on the order quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure;
manual derust St2.0 on secondary steel structure.
5. What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU sandwich panels.
6. How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need. if you have no workteams , we can send our professtional teams to install for you.
7. Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.
8. Prefabricated warehosue/workshop/Prefab house/Storage Life :
Reply : All steel structure frame life is more than 50 Years , all caldding sheets are about 20 Years .
Welcome you to send inquiry to our company NOW ,we would like to supply best service for you !
Contact : Ada Gao Whatsapp/Viber/wechat: +86 15981850388