LSU-A Packaging Speed with 15-80bag/min Snacks Packing Machine
USD $20,000 - $30,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Introduction
LSU-A Series Automatic packing machine is suitable to pack a wide range of high accuracy and easy fragile product, such as pet food, fish feed,corn flakes, snacks, breakfast cereals, rice, jelly, candy, fried pellet, chips, bean, seeds, dry nuts, etc.
Certificate
CE CERTIFICATE, ISO9001 CERTIFICATE.
Sample Picture
Features
1. It automatically finishes conveying product, weighing, bag-forming, measuring, filling, blowing nitrogen, code printing, cutting, conveying final bags.
2. Various package sizes can be made.
3. Nitrogen filling device can be added.
4. PLC and touch screen control.
5. Multi-head balance can well assure the accurate weight of each package, and protect the crispy products.
6. Packing material: any laminated film such as POPP/CPP, POPP/VMCPP, BOPP/PE, PET/AL/PE, NY/PE, PET/PET, etc.
Technical Parameters
Model | LSU-420A | LSU-520A | LSU-620A | LSU-720A |
Packing speed | 10-60pcs/min | 10-60pcs/min | 10-60pcs/min | 10-50pcs/min |
Bag length | 50-300mm | 80-350mm | 100-400mm | 100-450mm |
Bag width | 60-200mm | 80-250mm | 100-300mm | 100-350mm |
Power | 6kw | 6kw | 8kw | 8kw |
Dimension | 4076x4045x3500mm | 4076x4045x3500mm | 4076x4045x4300mm | 4076x4045x4300mm |
Weight | 1730kg | 2000kg | 2700kg | 2700kg |
Key Equipment Show
Delivery
Spare parts
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.
Our Office