LSU-X Squre Shape Instant Noodle Horizontal Packing Machine
USD $3,000 - $10,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
LSU-220 Flow pack machine is used to pack regular objects, like instant noodle, biscuit, bread, egg roll, moon cake, snow cake, spoon, cereal bar, medicine, hardware, industrial parts, paper box, plate, long tube dog snacks, etc.
Features
1. Dual frequency conversion, Bag length can be set and cut in one step, saving time and film.
2. Reasonable construct, stable working performance, and PLC computer control, easy operation.
3. Self fault diagnosis, clear fault display.
4. High sensitivity photo cell color tracing, numerical input of cutting and sealing position for extra accuracy.
5. Positioned stop function, without sticking knife or wasting film.
Technical Parameters
Model | LSU-220P | LSU-350P | LSU-420P | LSU-620P |
Film width | Max. 250mm | Max. 350mm | Max. 450mm | Max. 600mm |
Bag length | 65-190mm or 120-280mm | 65-190mm or 120-280mm | 120-450mm | 120-450mm |
Bag width | 30-110mm | 30-160mm | 50-160mm | 50-200mm |
Production height | 5-40mm | 5-40mm | 10-80mm | 10-80mm |
Film roll diameter | Max. 320mm | Max. 320mm | Max. 320mm | Max. 320mm |
Film thickness | 0.03-0.07mm | 0.03-0.07mm | 0.03-0.07mm | 0.03-0.07mm |
Packing speed | 40-230bag/min | 40-230bag/min | 20-80bag/min | 20-80bag/min |
Power | 220V, 50/60Hz, 3.4kw | 220V, 50/60Hz, 2.4kw | 220V, 50/60Hz, 4.2kw | 220V, 50/60Hz, 4.6kw |
Weight | 500kg | 600kg | 800kg | 900kg |
Dimension | 3770 x 640 x 1360mm | 4020 x 770 x 1450mm | 4380 x 870 x 1500mm | 4380 x 970 x 1500mm |
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.