Industrial Macaroni Making Machine/Whole Grain Penne making line
USD $10,000 - $100,000 /Set
Min.Order:1 Set
Jinan Darin Machinery Co., Ltd.
Introduction
Industrial Macaroni Making Machine By changing the moulds,
it can produce different shapes, including screw, shell, round tube,
square tube,ring, cartoon shape and sport shape and so on.
Industrial Macaroni Making Machine is reasonable design,
high automation, the extruding parameter can be controlled precise.
Samples
Features
Industrial Macaroni Making Machine has always been characterized by their
innovative technical solutions and their high degree of reliability.
Industrial Macaroni Making Machine can produce Macaconi, spaghetti, Fusilli,
penne, Conchiglie.
The raw material can be durum, maize starch, potato powder, potato starch,
cassava starch or their mixture, etc.
Technical Parameters
Output | Installed Capacity | Actual Capacity | Voltage / Frequency | Dimension |
100kg/hr | 45kw | 30kw | 380V / 50Hz | 15 x 5 x 3m |
Key Equipment Show
Advantages
This semimanufactured product is extremely compac,(apparent density
of 300~400 g/l, 10 times higher than that of the finished product) occupies
little space and can be easily preserved for over a year in normal environment
conditions, without particular packaging.
Pasta can be fried or cooked by customers in their own kitchen.
The Basic Flow Chart includes: Flour Mix - Screw Conveying - Extruding - Cutting - Drying - Cooling
Delivery
Customers Visit
Commissioning Service
1.We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2.After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3.1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4.Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5.It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6.The engineer’s round-trip flight tickets, accommodation and daily salary USD 60 are on client’s account.