FRP Sleeve Couplor Winding Machine
FRP Sleeve Couplor Winding Machine
FRP Sleeve Couplor Winding Machine

FRP Sleeve Couplor Winding Machine

USD $500,000 - $900,000 /Set

Min.Order:1 Set

Supply Ability:
12 Set / Sets per Month
Port:
Qingdao CHINA
Payment Terms:
Credit Card

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
LONGTECH
Model Number:
TZ-2600
After-sales Service Provided:
Engineers available to service machinery overseas

Qingdao Deyili Plastic Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: XPS foamed board extrusion line ,HDPE pipe extrusion production line ,GRP pipe winding production line ,Vacuum insulaiton panels ,Plastic auxiliary equipment

Product Details

The Brief Introduction of  FRP Sleeve Couplor Winding Machine

 FRP Sleeve Couplor Winding Machine

 

 

 

Product Description

 

 

It is one special GRP pipe fittings production system researched and developed by Longtech company.

Its features as blew: high technology, easy operation, high control precision, low control error and high

production efficiency etc.

  

Each parts of GRP coupling socket machinery:

Feeding system--formation system--driving system--groove making system--surface planning system etc.

 

Coupling socket technology data

Model:

TZ-2600

Driving power(KW)

5.5

Feeding system powerKW

11

Specifications (MM)

400-2600

 

Packaging & Shipping

Packaging

Standard sea-worthy package mainly with wooden pallet and film coverage for the main machine body; wooden cases for electrical parts & consumable parts. In 2 40' containers

 

GRP Production Team

FRP Sleeve Couplor Winding Machine 

Our Services

 1

Customize Design: Special design for every customers actual needs 

 2

Guarantee of qualityOne year guarantee of quality for line under correct operation.

 3

Documents supplyMechanical and electrical operation manual, Electrical connection 

drawing(1)and Operation technique manual(1).

 4

After-sales service provided: Engineers team available to service machine overseas.

 5

Machine maintenance: Machine lifelong maintenance while troublesome happens.

6

Upgrade: Free production software upgrading production formula, process technology and 

machine structure improves, etc. 

Company Information

Located in International Airport Industrial Zone, Qingdao Deyili Plastic Machinery Co., Ltd. A hi-tech 

enterprise specialized in researching, developing, and manufacturing plastic extrusion equipment. It was 

entitled Enterprise of New Technology&Materials of Ministry of Construction, Qingdao Top Ten Hi-

tech Enterprise, and Experimental Unit of Technology Venture Capital. 


We are mainly exporting to Russia, Turkey, Iran, Ukraine, 
Uzbekistan, Finland, Sweden, Austrilia,  and

other area of East Europe and mid-east.

Since foundation in 1998, Deyili has been persevering in technology innovation and devoted to 
R&D and

applications of new machinery, new technology and new technique. We have an excellent technical team 

and keeps close cooperation with many technology institute and universities. 

At present, Deyili owns 28 National Patents, 14 items supplied domestic gap and 6 items are National 

Key Products. We take the lead in development and updating of our key products, which reached the

highest technical level in China. 


Deyili passed certifications of ISO9001 and CE. According to criteria of modern enterprises, 
we are 

making great efforts to carry out effective management from production, supply, quality, technique, to 

services. Deyili has won wide recognition from domestic and overseas customers by high quality 

products and service. 

After years of exploration, the enterprise has been enlarged and strengthened continuously. Now 
it has 

become a group which widened its businesses from one fold plastic machinery to production of plastic 

pipes and pipe-fittings. Deyili can provide more integrated solutions and all-around services to customers 

from extrusion lines to technique and materials.

Our Factory

FRP Sleeve Couplor Winding Machine 

FAQ

Payment terms

30% down payment after signing the contract within 5 workdays, 

the rest 70% payment after test run in our factory and before shipment.

Accepting& inspecting

 in seller's factory

Bring into the agreed time, it is in seller's factory to accept and inspect.

The test run will make the pipes under two sides discussion, and

promise the machine works in succession for two hours. 

Other special request, negotiate by two sides. 

The charge of test materials should be paid by buyer side.

Installation&test-run

in buyer's factory

1)User should prepare the plant, operators and tools for machine

installing, and make the energy available such as water, electricity,

materials, work space, labors and so on.

2)Seller send one engineer for direction and supervising the

installing, test run and training. The test run will be finished in 15 days 

if there is other requests please inform in advance.

3)The buyer should pay $100 per day as subsidy for the engineer, and

in addition the round airplane tickets, food, hotel fee and insurance of

the engineer during the installation and test-run period.

Documents supply

Mechanical and electrical operation manual(1), 

Electrical connection drawing(1),

And Operation technique manual(1).

 

Welcome for your visiting and discuss the details on the technical and process.

The concrete information please write to our sales.

 

 

Contact Supplier

Ms. Carol ZHAO Manager Chat Now
Telephone
86-532-81920067
Mobile
86-13606301357
Fax
86-532-81920070
Address
Zhengyangxi Rd, Chengyang District, Qingdao City, Shangdong Province. China Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Building Material Machinery > Other Construction Material Making Machinery
Categories
Hi~