PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE
PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE

PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE

USD $180,000 - $300,000 /Set

Min.Order:1 Set

Supply Ability:
12 Set / Sets per Month
Port:
Qingdao CHINA
Payment Terms:
Credit Card

Quick Details View All >

Condition:
New
Type:
Pipe Production Line
Pipe Material:
Other, PA
Application:
Energy Supply Pipe
Production Capacity:
30m per minute
Place of Origin:
Shandong, China

Qingdao Deyili Plastic Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: XPS foamed board extrusion line ,HDPE pipe extrusion production line ,GRP pipe winding production line ,Vacuum insulaiton panels ,Plastic auxiliary equipment

Product Details

The features of  PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE

 PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE

 

Product Description

 The production line is in compact structure with rational design and high efficiency. 

It adopts the special screw for Nylon in order to solve the key problem on the difficulty 

of the material extruding and forming. The production process is stable and easy to 

control. The unique on-line cutting unit makes sure pipes incision smooth. The Nylon pipes 

are widely used in the fields of auto brake fuel pipe, fuel-supply pipe, instrument line and 

air-conditioning system for its thermostablility, corrosion resistance, 

bright surface and high intansity.

 

Main Technical Parameter

Model

Pipe range

(mm)

Screw diameter(mm)

Max output

(kg/h)

Total install power (Kw)

Speed (m/min)

SJPAG-20

5-20

55/25

10-40

30

5-30

 

 

Packaging & Shipping

 

Standard sea-worthy package mainly with wood pallets& film and some parts in plywood. In 1 40' containers.

 

 

Production Factory

PLASTIC PA11 PIPE PRODUCTION EXTRUSION LINE

 

 

 

FAQ

 

Payment terms

30% down payment after signing the contract within 5 workdays, 

the rest 70% payment after test run in our factory and before shipment.

Accepting& inspecting

 in seller's factory

Bring into the agreed time, it is in seller's factory to accept and inspect.

The test run will make the pipes under two sides discussion, and

promise the machine works in succession for two hours. 

Other special request, negotiate by two sides. 

The charge of test materials should be paid by buyer side.

Installation&test-run

in buyer's factory

1)User should prepare the plant, operators and tools for machine

installing, and make the energy available such as water, electricity,

materials, work space, labors and so on.

2)Seller send one engineer for direction and supervising the

installing, test run and training. The test run will be finished in 15 days 

if there is other requests please inform in advance.

3)The buyer should pay $100 per day as subsidy for the engineer, and

in addition the round airplane tickets, food, hotel fee and insurance of

the engineer during the installation and test-run period.

Documents supply

Mechanical and electrical operation manual(1), 

Electrical connection drawing(1),

And Operation technique manual(1).

 

Welcome for your visiting and discuss the details on the technical and process.

The concrete information please write to our sales.

 

 

Contact Supplier

Ms. Carol ZHAO Manager Chat Now
Telephone
86-532-81920067
Mobile
86-13606301357
Fax
86-532-81920070
Address
Zhengyangxi Rd, Chengyang District, Qingdao City, Shangdong Province. China Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Building Material Machinery > Pipe Making Machinery
Categories
Hi~