Buried integrated domesticsewage treatment equipment

Buried integrated domesticsewage treatment equipment

USD $12,000 - $100,000 /Set

Min.Order:1 Set

Supply Ability:
20 Set / Sets per Month
Port:
QINGDAO
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
China
Brand Name:
YIMEI
Model Number:
YMYC

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

Specifications

sewage treatment equipment embed under the surface ;
No secondary pollution ;
No impact on the surrounding environment.

Buried integrated domesticsewage treatment equipment

DSW-A equipment scope of application:

 

This underground sewage treatment is suitable for the residential area, hotel, nursing homes,

 

schools, mines, factories and such life organic wastewater treatment anything like industrial organic

 

wastewater treatment.

 

DSW-A equipment description of the process:

DSW - A device is designed for sewage and anything like industrial organic wastewater treatment, its

 

main processing method is used at present the mature biochemical treatment technology, biological

 

contact oxidation, water quality parameters according to general life wastewater design calculation,

 

press BOD5 200mg/l, average 20mg/l according to water BOD5 design. Six parts: (1) (2) beginning

 

pond contact oxidation ponds (3) the second pond (4) disinfection pool, disinfection device (5) sludge

 

pond (6) wind room, fan. Now discussed as follows:

 

1)beginning early: this equipment pond for pond, sewage leaking Kennedy streaming rising velocity

 

in traps 0.6-0.7 mm/SEC, precipitate down with air mention to sludge sewage sludge pond. (note:

 

DSW - A0.5-5m3 / h do not set beginning pond)

 

2)contact oxidation pool of water after: beginning the sink are analysed to contact pool biochemical

 

treatment, contact pool three levels, total retention time for more than four hours, heavy-duty

 

equipment contact oxidation time can reach 6 hours, packing for novel trapezoidal packing, easy

 

conjunctival, no congestion, packing for 160m2 / m3 than surface area than gas-water contact, pool in

 

12:1 around. (note: DSW - A0.5-5m3 / h contact pool for level 2)

 

3)the second pond: the sewage flows into biochemical second pond, the second pond leaking for two

 

vertical flow velocity parallel-running, rise 0.3-0.4 millimeter/SEC, row mud USES air mention to

 

sludge pond. (note A0.5 DSW - 5m3 / h sludge artesian - to sludge pool)

 

4)sterilization tank and disinfection device: according to the standard: "disinfection pool TJ14 74"

 

standard for 30 minutes, if the hospital sewage, sterilization tank can increase the retention time to 1-

 

1.5 hours. By using solid chlorine slices of dissolved disinfection way, contact with disinfection

 

disinfection pool, according to the size of the device can change constantly, &safe-durable

 

Variable dosage, achieve much more medicine, less water water less the purpose of dosing, need

 

other device can be made separately.

 

5)sludge pond: beginning pond, the second pond with all the sludge are DSW - A

 

lift to the air within the sludge pond aerobic digestion, sludge pond with

 

supernatant fluid flowing to contact oxidation in the pool before treatment,

 

digestion, excess sludge rarely after general 1-2 years clean up, cleaning method

 

can be used FenChe absorption from the sludge pond inspection hole stretch into

 

sludge after bottom department for suction can. Sinotrans (DSW - A0.5-5m3 / h

 

sludge using anaerobic digestion)

 

6)the wind room, fan: equipment DSW - A computer in the wind, the wind above

 

the sterilization tank engine room with double layer sound insulation, 2 imported A

 

muffler, fan filter, so runtime without noise. Fan adopts two L ROM dimitrios

 

blower, it can automatic alternating single machine operation, the fan operation

 

life of 30,000 hours.

 

DSW-A equipment Technoloty Parameters Table:

Name,type

A-0.5

A-1

A-3

A-5

A-10

A-20

A-30

Treatment capacity(m3/h)

0.5

1

3

5

10

20

30

 air blower

type

L13LD

L21LD

L22LD

L23LD

L32LD

power (KW)

0.75

1.5

2.2

4

7.5

water pump

type

ASl0-2CB

ASl6-2CB

power (KW)

1.0

1.6

water inflow

BOD5mg/l

150-400

water yield

BOD5mg/l

20-60

equipment weight (T) approximately

2.5

4.5

6

9

9

12

15

 

DSW - A equipment all facilities are set in A number of the cabinet, made by the

 

A3 steel box, the thickness of the steel plate handled, each box 8mm with

 

seamless steel tube connection, equipment inside and outside all use chemical

 

product promotion chlorosulfonated polyethylene anti-corrosion coatings,

 

equipment general besmear brushs the paint 8 way: 2 coat 6 road face paint,

 

corrosion life generally available for 10 years.

 

Set of DSW - A design of equipment maintenance cycle for 10 years.

 

Buried integrated domesticsewage treatment equipment

 

 

Buried integrated domesticsewage treatment equipmentBuried integrated domesticsewage treatment equipmentBuried integrated domesticsewage treatment equipmentBuried integrated domesticsewage treatment equipment

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~