Hospital integrated wastewater treatment equipment/sewage treatment plant
Hospital integrated wastewater treatment equipment/sewage treatment plant
Hospital integrated wastewater treatment equipment/sewage treatment plant
Hospital integrated wastewater treatment equipment/sewage treatment plant
Hospital integrated wastewater treatment equipment/sewage treatment plant
Hospital integrated wastewater treatment equipment/sewage treatment plant

Hospital integrated wastewater treatment equipment/sewage treatment plant

USD $2,300 - $23,000 /Set

Min.Order:1 Set

Supply Ability:
100 Set / Sets per Month
Port:
Qngdao
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Shandong, China
Brand Name:
YM
Model Number:
YMYT

Qingdao Yimei Environment Project Co., Ltd.

Business Type: Manufacturer,Trading Company
Qingdao Shandong China
Main Products: Waste Water Treatment Plant ,MBR Sewage Treatment Plant ,Dissoved Air Flotation Machine ,Jet Flow Air Flotation Machine ,Submersible Mixer

Product Details

 


 Hospital integrated wastewater treatment equipment/sewage treatment plantHospital integrated wastewater treatment equipment/sewage treatment plantHospital integrated wastewater treatment equipment/sewage treatment plant

Hospital integrated wastewater treatment equipment/sewage treatment plant

1) Underground(on the ground can be choosed) Hospital Wastewater Treatment Equipment(YM) can be embeded below the surface,therefore there is no floor space and no need for plant construction, neither heating nor heat preservation. The surface can be afforested.

2)

YM device consists of steel structure, adopts new anti-corrosion material. And its anti-corrosion can reach 20 years

3)It uses plug flow biological contact oxidation pond, the effect is better.It is smaller than active sludge pool. It has strong applicability to the water,good impact resistance performance, stable discharging water quality,but no sludge expansion. In addition, the new elastomeric stereoscopic materials applying to the oxidation pond bring a higher removing rate, and also can improve the water solubility of oxygen

4)

Because of the low volume load of fillings in AO bio-treatment technology of and microbes in the stage of oxygen, this equipment would produce less mud. Generally,around 90 days need only one sludge removal.

5) 

In addition to using conventional silencer to air blower,it sets new acoustical material inwall.When it is operating,noise would be under 50 decibel that reduce the influence to surrounding environment.

6) 

Except for the conventional air exhaust, the device is equipped with soil deodorization measure.Uitimately,stench element is decomposed by the microorganism for deodorization.

 7) 

It is equipped with automatic electric control system and equipment damage alarm system. The device has good reliability,therefore, there is no need for special management, just needs regular maintenance . 

8)Through advanced technology workers and advanced automatic control technology increase, reduce the sewage treatment cost, processing cost in 0.3 yuan/m3

Hospital integrated wastewater treatment equipment/sewage treatment plant

Contact Supplier

Ms. lin chen manager Chat Now
Telephone
86-532-88180456
Mobile
0086-13853232196
Fax
86-532-88180610
Address
Chang an Road, Jiaonan Qingdao Qingdao,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Environment > Water Treatment
Categories
Hi~