Gld Processing Plant With Cyanide Leaching Process

Gld Processing Plant With Cyanide Leaching Process

USD $50000.00 - $50000.00 /Set

Min.Order:1 Set

Supply Ability:
50 Set / Sets per Month
Port:
QingDao
Payment Terms:
T/T

Quick Details View All >

Condition:
New
Type:
Other, gold ore cyanide leaching plant
Production Capacity:
98%
Place of Origin:
Henan, China
Brand Name:
HengXing
Model Number:
50-500T/D

Zhengzhou Hengxing Heavy Equipment Co., Ltd.

Business Type: Manufacturer,Trading Company
Zhengzhou Henan China
Main Products: Mining Machinery ,AAC Block Plant ,Briquette Machine

Product Details

Product Description

gold ore cyanide leaching plant:

In This , we use processing 500 t of gold ore for one day as example:



first Ores by the vibrating feeder get into the jaw crusher PE 400 * 600, after the primary crushing, ore get into the jaw crusher PEX250 * 1000 to the second crushing, PEX250 * 1000 and vibrating screen at the same time form a closed circuit system,

ores bigger than 20mm back to the crusher ,less than 20 mm ores by electromagnetic vibrating feeder enter into the ball mill, and also the ball mill and classifier 1500 * 9000 form a closed circuit system, solution then get into the hydrocyclones, bigger than 200 mesh particles into the second ball mill 1830 * 5500 regrinding.less than 200 mesh particles into the thickener,


After dealing with by the thickener, solution density reached 35-50%, then go into the leaching reaction tank , the first leaching tank to join the cyanide and need to control the PH 10-10.5,

on the last leaching tank to detection cyanide concentration detection, cyanide concentration of 0.03% to 0.06%, this line the leaching time is 24 hours at the same time adding activated carbon In the eighth leaching tank to adsorption, activated carbon flow movement to the fourth leaching tank, after activated carbon adsorption saturation, using carbon pump get out the activated carbon


Then use the electrowinning machine to process the loaded carbon, After that smelt to get the 99.99% gold. in this way the activated carbon can be recycled gold recovery rate can reach 97%.

tailings use filter pressure processing, water and sodium can be recycled, reduce the pollution and reduce the wastage of water

Detailed Images
Factory Workshop
Contact

Ms Sara 

Mobile phone(whatsapp): 0086 137 8347 1727 
Skype: sarapang6
Wechat: sarapang6
Email: sales006#


Contact Supplier

Ms. Sara Pang Manager Chat Now
Telephone
0086-371-67858720
Mobile
0086-13783471727
Fax
0086-371-67858720
Address
No.8 Hongye Road.West Hehuan Street. High -Tech Development Zone. Zhengzhou.China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mineral Separator
Categories
Hi~