Horizontal Automatic Continous Flexible Foam Making Machine
USD $132,000 - $155,000 /Set
Min.Order:1 Set
Dongguan Yangao Machinery Co., Ltd.
Horizontal Automatic Continous Flexible Foam Making Machine
Dongguan YangAo Machinery Co., Ltd is specialized in research and development and manufacture foam machines. Take the advance technology of some profession and improvement. Absorb the new originality strictly control the product quality full service tracking insist on manufacturing the high quality products. Our main products YA-AF Flexible Foam Production Line can make the foam for furniture industrial shoes industrial and so on.
The YA-AF Flexible Foam Production Line is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming.
Main Specification
Oven Length | 18m | Inner Conveyer length | 18m |
Foaming Height | 1.0-1.25m | Side Borar Adjustable Width | 0.98-2.3m |
Foaming Width | 1.0-2.25m | Conveyer Belt Speed | 0-8m/min |
Foaming Density | 8-100kg/m3 | Fall Plate | Six section adjustable |
Total Power | 130KW | Total output | 100-300kg/min |
Horizontal Automatic Continous Flexible Foam Making Machine
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
How many container will be needed for the whole set of machine?
For the Horizontal Automatic Continous Flexible Foam Making Machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
We will try the best way to pack all the machine well and also save the freight cost.
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Just click "send" now for more details!