PU Foam Spray Machines
PU Foam Spray Machines
PU Foam Spray Machines
PU Foam Spray Machines
PU Foam Spray Machines
PU Foam Spray Machines

PU Foam Spray Machines

USD $135,000 - $153,000 /Set

Min.Order:1 Set

Supply Ability:
2 Set / Sets per Month
Port:
SHENZHEN CHIWAN/SHEKOU/YANTIAN
Payment Terms:
T/T L/C D/P D/A

Quick Details View All >

Condition:
New
Product Type:
Other, PU foam spray machines
Place of Origin:
Guangdong, China
Brand Name:
YAMACH FOAM MACHINE
Model Number:
YAFM-2015
Voltage:
380KV

Dongguan Yangao Machinery Co., Ltd.

Business Type: Manufacturer
Dongguan Guangdong China
Main Products: foam machine ,foaming production line ,continuous foaming machine ,max flexible faom ,batch foaming machine

Product Details

PU Foam Spray Machines foam making machine line 

 

 

 

Product Description

 

 

  YAFA PU Foam Spray Machines is the horizontal continous foaming machine line that can make the foam for mattress and sofa and flexible foam in low pressure. We use the siemens invertor/motor and U.S. viking pump and some good spare parts that good for make the flexible foam. The density we can make is from D8-D100 and we can add abt 50% of the lime powder during density above D23.

 

Main Specification

 Oven Length18m    Inner Conveyer length18m
Foaming Height1.0-1.25mSide Borar Adjustable Width0.98-2.3m
Foaming Width1.0-2.25mConveyer Belt Speed 0-8m/min
Foaming Density  8-100kg/m3  Fall Plate Six section adjustable
Total Power130KWTotal output 100-300kg/min
    

 

 

PU Foam Spray Machines

 

 

tank filling system and tanks 

 

PU Foam Spray Machines

 

Motor and pump from the tank to the mixing head for making the foam

 

PU Foam Spray Machines

 

Control system for the  YAFA Horizontal Continuously Foam Machine

 

PU Foam Spray Machines

Packaging & Shipping

 How is the packing of the machine?

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

 

How many container will be needed for the whole set of machine?

For the standard YAFA-Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

PU Foam Spray Machines

 

 

Our Services

 

  • We will help to design the layout of the machine that put in your factory.
  • We will send 2-4 experience engineers to install and testing the machines.
  • We will teach your engineer how to operate the machine and how to maintain the machines.
  • We will give you the machine operation manual and the best formulation for target products that you are going to make.
  • We will help to buy the best raw material for making the foam if you needed.

 

PU Foam Spray Machines

 

Company Information

 

About YangAo Machinery

 

Dongguan YangAo Machinery Co., Ltd is specialized in research and development and manufacture foam machines. Take the advance technology of some profession and improvement. Absorb the new originality strictly control the product quality full service tracking insist on manufacturing the high quality products. Our main products YA-AF Flexible Foam Production Line can make the foam for furniture industrial shoes industrial and so on. Our foam machines sales well in and out of China have an excellent public reputation. Our concept is “innovating, quality, service, dedication, thankful”. Try our best to be the No.1 in foam machine industries.

 

Our head office Chenghui Investment CO.,Ltd and Hangtai Shoe  have their own professional R & D polyurethane products teams. They make the high density foam and memory foam and own its brand name “ MSJ “ products sales well all over the worlds.

FAQ

 

Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do ?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 

Q: During the using of the products if we find some problem how can we slove?

A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.

 

Q: How many spare parts for you to give us?

A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy. 

 

 PU Foam Spray Machines

 

 

Any more details about the foaming machine just click " send" now and we all waiting for you!

 

 

 

 

 

Contact Supplier

Ms. Wind He Manager Chat Now
Telephone
0086-769-26996813
Mobile
13925736863
Fax
0086-769-26995187
Address
No.18 Industrial North Road, Shangjia Dazhou Industrial Area, Wanjiang District Dongguan,Guangdong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Plastic & Rubber Machinery > Plastic Product Making Machinery > Foam Machinery
Categories
Hi~