YA-FA Continous Foam Sponge Machine
USD $138,000 - $155,000 /Set
Min.Order:1 Set
Dongguan Yangao Machinery Co., Ltd.
YA-FA Continous Foam Sponge Machine
Dongguan YangAo Machinery is one of the foam machinery factory located in Dongguan city which is famous for the manufacturing. We gain the high technology and update information in foam industry. We have our own foam factory and R & D team to ensure our machine to be the best one and make the foam with high quality with low cost.They make the high density foam and memory foam and own its brand name "MSJ" products sales well all over the worlds.
YA-FA Continous Foam Sponge Machine is the main products that we make this machine can make the foam for furniture sofa and mattress use foam and also for the shoes with Ortholite foam. The machine can be make the foam continously then cut into long foam sheet for other process.
YA-FA Continous Foam Sponge Machine specification
Oven Length | 18m | Inner Conveyer length | 18m |
Foaming Height | 1.0-1.25m | Side Borar Adjustable Width | 0.98-2.3m |
Foaming Width | 1.0-2.25m | Conveyer Belt Speed | 0-8m/min |
Foaming Density | 8-100kg/m3 | Fall Plate | Six section adjustable |
Total Power | 130KW | Total output | 100-300kg/min |
Foaming groups | standard 13grous | material tanks | standard 5tons for PPG/POP/TDI |
YA-FA Continous Foam Sponge Machine control system using the Delta invertor
YA-FA Continous Foam Sponge Machine material tanks and lading system
YA-FA Continous Foam Sponge Machine foam products
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
How many container will be needed for the whole set of machine?
For the YA-FA Continous Foam Sponge Machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
We will try the best way to pack all the machine well and also save the freight cost.
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
We will help to buy the best raw material for making the foam if you needed.
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
For more information just click "send"and we will always give you the best information.