Silicon steel core cut to length line for transformer core cutting
Silicon steel core cut to length line for transformer core cutting
Silicon steel core cut to length line for transformer core cutting
Silicon steel core cut to length line for transformer core cutting
Silicon steel core cut to length line for transformer core cutting

Silicon steel core cut to length line for transformer core cutting

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Wuxi Haoshuo Technology Co., Ltd.

Business Type: Agent
Main Products: , , ,

Product Details

 
Product Description

 

Silicon steel coil cut to length line for transformer lamination

 

This production line is automatic cut to length line for silicon steel coil, is necessary production equipment for transformer lamination manufacturing. It can cut step-lap cores, 45 degree and 135 degree shear, transverse and longitudinal progressive shear, hole punching and v notching. The line can be suitable for cutting series shapes of work pieces used in the manufacturing of transformer industry.

 

Our production line has high quality with high speed. All electric elements use International famous brand products. The line has high stable performance with high precision.

 

Work Process:

Coil decoiling – buffer pit for coil storage – servo feeding for length measuring – electric hole punching – servo positioning servo V notching – cutting coil sheet into required shapes by 2 shears – work pieces feeding & collecting – automatic product stacking

 

Machine Components:

1.Double Head Decoiler
2.Servo Feeder
3.V-shaped Punch
4.Shears 1
5.Shears 2
6.Discharge Units(Belt)
7.Stacking Table
8.Controlling System

 

Main Technical Parameters:

ParameterHJX-400,600
Width of Sheet(mm)40-440,660
Length of Sheet(mm)300-3000
Thickness of Sheet(mm)0.20-0.35
Feeding Speed(m/min)0-240
Accuracy of Cutting Length(mm)±0.10
Accuracy of Cutting Angle(°)±0.025
Cutting Burr(mm)≤0.02
Installed Power(kw)as per need

 

 

 

 

Our Services

  

 
Packaging & Shipping

Seaworthy export standard packing for the machine. All machine parts are well fastened and fixed by blocks and wire ropes.

Normally one machine needs two 40 feet containers

 
FAQ

1. Machine installation & commissioning, training:

2-5 technicians will be dispatched to Buyer’s plant for installation & commissioning. Work period: in 25 days

The expense of round trip tickets, accommodation, safety and interpretation shall be covered by Buyer, additional pay allowance to the technicians.

2. warranty: one year

3. Price basis: FOB or CNF or CIF

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Minerals & Metallurgy > Steel > Silicon Steel
Categories
Hi~