OEM roll to roll Wet wipes Nonwoven hot air Jet Tunnel dryer
OEM roll to roll Wet wipes Nonwoven hot air Jet Tunnel dryer
OEM roll to roll Wet wipes Nonwoven hot air Jet Tunnel dryer
OEM roll to roll Wet wipes Nonwoven hot air Jet Tunnel dryer
OEM roll to roll Wet wipes Nonwoven hot air Jet Tunnel dryer

OEM roll to roll Wet wipes Nonwoven hot air Jet Tunnel dryer

Negotiable /Set

Min.Order:1 Set

Supply Ability:
1000 Set / Sets per Month
Payment Terms:
T/T L/C
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
TAMPRINTER
Place of Origin:
China
Model Number:
TM-IR4m-jet
Type:
Other, Tunnel Infrared Dryer
After-sales Service Provided:
Overseas third-party support available
Condition:
New

Shenzhen Tamprinter Printing Machin

Business license
Business Type: Manufacturer
Shenzhen Guangdong China
Main Products: UV curing machine ,printing dryer ,Screen printing machine ,UV exposure machine ,re mesh tighten stretching machine ,Screen stencil drying oven ,IR drying tunnel conveyer ,Gold glitter powder auto screen printing machines ,hot melt glue automatic screen printing machine

Product Details

Nonwoven Jet Tunnel dryer without conveyor belt

 Warning

              Please read this operation manual carefully before working

 

Content

1     Safety instruction. 3

1.1      Safety regulation. 4

1.2      Warning signs (figure/photo) 5

1.3      The interpretation of signs 6

2     Specification. 7

2.1      Machine function and feature. 8

2.2      Machine's model and nameplate. 8

2.3      Specification table. 11

2.4      Machine noise value. 12

2.5      Main parts(figure)... 12

2.6      Machine dimension(figure)... 13

2.7      Circuit diagram . 13

3     Installation. 15

3.1      Transit safety item.. 15

3.2      Transit method. 15

3.3      Installing place selection. 16

3.4      Installation method/(picture) 16

3.5      Installation and level adjustment 17

3.6      Power source requirement 17

3.7      Exterior power source connection. 18

3.8      Power source inspection. 18

4     Operation. 19

4.1      Operation position(figure) 19

4.2      Operation panel instruction. 19

4.3      Emergence stop. 20

4.4      Operation precedure. 20

4.5      Machine adjustment 21

5     Maintenance. 23

5.1      Machine day、week、year maintenance. 23

5.2      Machine lubrication. 25

5.3      Machine malfunction and handling. 25

6     Machine waste disposal 26

7     Safety and protection. 27

2         Specification

  1. machine’s working principle & function and feature

Working principle:

Hot air furnace blowing hot air so that non-woven moisture evaporation.

Dry hot stove in the electronics, food, pharmaceutical, printing, packaging, cleaning, heat treatment ... ... the industry has a very wide range of applications.

Function and feature:

  1. Dry hot stove with stainless steel heating pipe heating air for hot air, clean and sanitary, in line with environmental protection..

  2. Multi-fiber insulation cotton insulation, the use of safe and reliable, long-term high temperature work.

  3. Standard type of hot air fan application patented design of the cooling device, air volume adjustment using VDF speed, more energy saving, high controllability, heat loss and other excellent features.

  4. Equipped with double overheating overload protection device, fully guarantee the safety of equipment. Set the thermocouple outlet, direct detection, the outlet temperature.

    1. Model and machine nameplate

  5. Specification table

Model Parameter

TM-IR4m-jet

Tunnel Width(mm)

650

Power(P/V/Hz)

3/380/50

Heat pipe(KW)

3pcs*6kwX 2Group=36

VDF power(W)

1.5KW*2PCS

Total power(KW)

40

Tunnel Dimension(L*W*H)

4050*1010*1680

Electric box (L*W*H)mm

600*600*960

Weight(kg)

580

Note:All specification, dimension and design will not change if there is not any notice.

 

        Installation

 

3.1       Transit safety item

1.  During transiting (moving or loading and unloading vehicles), machine should be moved by fork-lift and kept the balance. Carry it by carriage or container.

2.  Use the enough load capability fork-lift to transit machine.

  1. When move the machine, you can ask others to lead the ways and watch the safety.

4.  During transiting,it should avoid collision and bad weather. And pay attention to protect the machine’ surface painting from damaging. When need to save the machine temporarily, please place it in a dry and room temperature environment. 

5.  The fork lift must be driven by the experienced driver.

6.  The equipment can be moved by push. But be caution the speed.

7.  As the installation position plan, choose the proper installation position, and notice to keep enough distance with the surrounding barrier.

8.  When install the machine, the machine’s longitudinal and transverse level can be adjusted by the adjusting screw at four corners.

9.  If the equipment is damaged or short of parts, please don’t run it.

 

3.2 Transit method

1.Machine can be moved by fork lift.

2.Fork lift should insert the bottom of the machine.

3.Keep the balance of machine when moving it.

3.3  Installing place selection

Please run the machine in follow situation

Environment

Environment

temperature

-10℃~45℃(no ice cover)

Environment

humidity

Bellow 90%RH(no dew)

Save temperature

-20℃~+65℃

Environment

In room

(No causticity、flammable gas、paint dust)

Altitude height

Below 1000m

 

3.4  Installation method/figure

 When installing the machine, there must be more than 1.5 m distance between the wall and machine. 3m spaces also have to be left for equipment operation.

 

3.5  Installation and level adjustment

Install this machine in the solid state reinforced concrete, and excess space can be used to place the work piece .When machine installed in the correct place, you can adjust machine longitudinal and transverse level by the adjusting screw at four corners.

 

3.6   Power source requirement

If the power source’ voltage is not enough, it will affect the motor’s output and the controller’s function.

It is very important to use the correct voltage to connect the machine and the power source. And only use the independent power source.

 

3.7   Exterior power source connection

Before connect the power source wire, you must make sure whether the machine voltage is the same as factory’ power source voltage.

Connect the wire to L1、 L2、 L3 、N、PE.

After connected the wire, make sure it is connected on the right Joints (figure)

Machine must be correct grounding so as to prevent from electric shock. Machine should be operated by the qualified electrician.

 

3.8   Power source inspection

   

 

Power Switch                                      power source switch

 

1.After connect the power source,it is very necessary to check whether the wire are  connect to the joints correct.

2. Rotate main switch on electric controller.

3. open the electrical control box, try to change three phase L1L2L3 sequence, Check whether the electrical source’ three phase wires are connected correct. Phase sequence indicator  LED Light Up is OK

 If not, exchange any two wires connection of three phase line L1, L2, L3.

4.  Above operation should be operated by the qualified electrician.

 

4.      Operation

4.1Operation position (figure)

4.2   Operation panel instruction

 

4.3  Emergency stop

 

During the machine running, if there are any abnormal function occurred; press this button to stop all movement. When resume of this button, first switches all vdf at the min position.

Ir Drying Tunnel , Printing Machinery , Ventilation Heat Recovery , industry Heat Recovery , air Heat Recovery , air Heat Recovery shenzen , hot air echanger 200 , hot exchanger 200 , recuperation unit , hot air recuperation unit , air to air exchanger , air to air high temperature exchanger , Heat Recovery Ventilation System , Heat Recovery Ventilation System high temperature , Heat Recovery Ventilation System high temperature 200°C

4.4  Operational procedures

Figure  1                             

               

1、Before the first start-up, machinery should be checked whether grounding, then user should pay attention to check whether the grounding line remains firmly grounded everyday.

2、Before start-up , the protective covers and protective doors should be closed, or

choose to use tape to seal the leaky mouth AIR pipe to avoiding workshop temprature raise.

3、First turn power switch to the right (Figure 1), the main power lines in electronic

control box are connected, and fan starts to work..

4、Periodically check the electrical wiring for circuit phenomenon.10、Adjust the belt tension on both sides to prevent the belt running to the false way.

5、Having good hygiene, to prevent dust.

6、If there is an imminently hazardous situation, immediately turn off the main power switch, to avoid further accidents.

 



Payment Terms︰ TT / LC

Industrial Use Drying OvenIndustrial Use Drying Oven

Paint Drying OvenPaint Drying Oven

Industrial Vacuum Drying OvenIndustrial Vacuum Drying Oven

Printing Ink IR Tunnel DryerPrinting Ink IR Tunnel Dryer

High Precision Drying OvenHigh Precision Drying Oven

Paint Infrared OvenPaint Infrared Oven

Paint IR Tunnel DryerPaint IR Tunnel Dryer

Industrial Hot Air Drying OvenIndustrial Hot Air Drying Oven


Contact Supplier

Mr. Tam liu manager Chat Now
Telephone
86-180-25318431
Mobile
86-15994744161
Skype
tamprinter
Address
1st Floor, Building E, No. 62, Yongnan Road, Yabian Village, Shajing Street, Baoan District, Shenzhen,Guangdong
Whatsapp
8615994744161

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Chemical & Pharmaceutical Machinery > Chemical Machinery & Equipment > Drying Equipment
Categories
Hi~