China design Economic Design Easy Build workshop storage warehouse Prefab Steel Structure Hangar
Negotiable
Min.Order:1
Chinese Steel Prefabricated Cheap Warehouse/warehouse Building steel structure hangar building
Steel structure warehouse prefabricated industrial steel structure storage workshop shed
Prefabricated steel structure/warehouse building construction materials prefab steel warehouse
workshop steel structure buildings chicken house door opener prefabricated steel warehouse
|
Overseas projects we undertook in the last few years
Industrial Warehouse (13000 m²)—Argentina
Warehouse (14000m²) —Republic of Uzbekistan
Workshop (12000m²) —Canada
Warehouse(3600m²) —Romania
Vegetable Market(2500m²) —Mauritius
Pig shed(3500m²) —USA
Chicken shed(2800m²)—Australia
Aircraft Hangar(1300m²) —Australia
Warehouse(900m²) —Mongolia
Prefabricated house(70m²) —800 sets—Angola
Container house (20') —60 sets —South Africa
1. How to buy your ideal products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.
2. What is the delivery time?
A: It depends on the order quantities. Generally speaking, the delivery time will be within 15 to 40 days.
3. How to pack the products?
A: We use a standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4. How to install the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.