2022 Gable Frame Light Metal Building Steel Structure Warehouse Prefabricated Industrial Workshop
Negotiable
Min.Order:1
Item Name |
steel structure warehouse |
Size |
Length, Width, Roof height, and Eave Height |
Roof and Wall |
PU, EPS, Rock Wool sandwich panel |
Door and Window |
PVC or Aluminum Alloy |
Column and Beam |
Hot rolled H section, I section or Galvanized |
Purlin |
C-Section and Z-section |
Surface |
2 primer and 1 finished paint |
Local Climate |
d speed 2.Rain load 3.Snow load 4.Earthquake grade if have etc. |
Crane parameter |
If need crane beam, the parameter is in need. |
Drawing |
1.quote as clients' drawing 2.Design as per clients' requests and quote. |
Package |
standard packing or as request |
Load-in |
20GP, 40GP, 40OT |
Overseas projects we undertook in the last few years
Industrial Warehouse (13000 m²)—Argentina
Warehouse (14000m²) —Republic of Uzbekistan
Workshop (12000m²) —Canada
Warehouse(3600m²) —Romania
Vegetable Market(2500m²) —Mauritius
Pig shed(3500m²) —USA
Chicken shed(2800m²)—Australia
Aircraft Hangar(1300m²) —Australia
Warehouse(900m²) —Mongolia
Prefabricated house(70m²) —800 sets—Angola
Container house (20') —60 sets —South Africa
1. How to buy your ideal products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, 50% balance before loading by TT.
2. What is the delivery time?
A: It depends on the order quantities. Generally speaking, the delivery time will be within 15 to 40 days.
3. How to pack the products?
A: We use a standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4. How to install the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers. Fast construction steel structure large span building