Solar water heater making machine CNC turret punching machine
Negotiable
Min.Order:1
Shandong Zentek Energy and TechnologyCo., Ltd. , as a member of CSP Holding Group, is a professional manufacturer of production equipments and gears for both electric and solar water heaters. We have been devoting ourselves to customized design and engineering, manufacturing, machinery upgrading and production line improving for customers from all over the world.
The machineries we manufacture include fully and semi-automatic solar/electric water heater inner tank production line and outer tank production line, press machine, welding machine, foaming line and enameling line etc..
Our products have been exported to over 20 countries, such as India, Europe, Egypt, U.A.E., Mexico, Brazil etc.. Our customers include A.O. Smith and Havells in India, Artel in Uzbekistan and so on. Especially the line for Uzbekistan, it was the first complete line exported from China ever. We are looking forward to the cooperation with partners worldwide.
There are 12 station in this machine and the DIE can be changed easily.
1.Valid stroke: One location 1500*1250mm.
2.Punching Speed: 120 time/min minimum;
3.Punching force: 300KN;
4.Accuracy: ±0.1mm
5.Punch housing: Adopt strengthened rib plate (80mm), strong housing, not easy to bedeformed.
6.CNC Feeding machine housing: feeding part whole set has been drawing temper treated at fireplace; internal stress has been eliminated completely. Housing adopts widened lever double rail design, more stable.
7.Clutch: Pneumatic rubbing clutch, adopting safe double values control, endurance good.
8.Turret/Die: Adopt international common die. Die setup height 660mm, AMADA thick turret long guiding construction. Die material is Japan High-speed tool steel SKH-9. The dies supplied are compatible with AMADA AE255NT and AE2510NT machines.
9.Guide screw/linear guide rail: Adopt Taiwan Hiwin product, long distance precise ball screw: 5 degree accuracy. Linear guide rail adopts widened flange type slider.
10.Motor/Driver: Panasonic AC servo motor
11.Main electric component: Whole set Schneider electric component. Proximity switches are from
Japan OMRON. Contactor is from Siemens.
12.Control Unit: Siemens system
13.Coupler: Italy SIT Coupler, to ensure driving and correcting/adjustment accuracy.
14.Pliers: Pneumatic floating pliers. Can avoid sheet damage during punching
15.Work table: Good quality flexible brush, running stable, no resistance, will not scratch sheet.
Process parameters | ||
1 | Construction type | Open type Punch |
2 | Throat depth | 760mm |
3 | Rated force | 300KN |
4 | Punch accuracy | ±0.1mm |
5 | Sheet max. size | 1500X1250 |
6 | Die Station No. | 12 |
7 | Max. punch hole size | 80mm,All are at C station |
8 | Housing construction | Reverse T type entirely welded, and then annealing in electric furnace |
9 | Working table | Brush + ball transfer |
10 | Die older construction and material | Nodular cast iron, Entirely cast-on. |
11 | Die | Made of Imported high-speed tool steel with special treatment, Endurance life is >800 K cycles. Hardness more than HRC62 |
12 | Punching speed | 120 time/min minimum |
13 | Die holder rotating speed | Max. 30 cycle/min |
14 | Guide screw | Taiwan Hiwin |
15 | Servo Motor | Delta (Taiwan) |
16 | Out shape size | About 5100X3600X2400 |
17 | Whole weight | About 10 T |
18 | Compressed air | 0.5-0.8 Mpa |
19 | Pliers number and construction | Floating pneumatic pliers, 2 pcs. |
1. Q: What servicesare availabe?
A: Services we could offer: product design, machine production, installation&debugging, local production guidance, spare parts supply etc.
2. Q: What is your payment term?
A: 30% prepaid, 60% paid before loading, 10% paid after installation and debugging at customer's plant.
3. Q: How long will machines be delivered?
A: The time depends on how many sets of machines you require. 20 days to 5 months.
4. Q: How will the machines be packaged?
A: Normally machines will be covered with film and fastened in the container. But package could be customed, like steel frame, wooden boxes etc..
5. Q: How long will the machines be guaranteed?
A: One year.