Lab Wet Spinning Machine
Lab Wet Spinning Machine
Lab Wet Spinning Machine
Lab Wet Spinning Machine
Lab Wet Spinning Machine

Lab Wet Spinning Machine

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Anytester (hefei) Co., Ltd.

Business Type: Manufacturer
Main Products: , , ,

Product Details

Product Description
AT235 Bench-top Wet Spinning Machine is used for the production of polymers that need to be dissolved in a solvent to be spun. It is specially designed for researching new material in the field of textile, macromolecule and other material. It consists of pressure vessel, metering pump, gooseneck, spinneret, coagulating bath, conveying rollers, air-heating device, conveying, washing bath, slow drawing rolls and thermal-setting device, fast drawing rolls and winding device.
Feature
★ Pressure vessel for holding pre-mixed polymere/solvent mixture with manual lifting platform to move it with dosing pump, gooseneck and spinneret up or down together; 
★ Cover of pressure vessel with a connection for inert gas feed and a safety pressure valve; 
★ A mixture circulation driven stirrer for pressure vessel is optional; 
 ★ 316L stainless steel gooseneck and coagulating bath;
★ Coagulating bath with two filament pressing rollers and optional heating system; 
★ Optional heating system for coagulating bath; 
 ★ Heating slot adopts non-touch air heating; 
★ One winding position take-up winder; 
★ A potentiometer to adjust starting winding speed and tension controller;
★ Adjustable yarn spacing by travers motion speed; 
 ★ Nylon drafting rollers with adjustable rotation speed; 
★ The whole line adopt quick joint connecting, it’s easy to assemble; 
★ It can simulate the whole process; 
★ Mini size, save space;
Specification
Packing & Delivery
Packaging


Packaging Details
1. The equipment is covered with film is protect it from water vapour during the trip.

2. The box is filled with foam to protect the equipment from impact. 

3. Exported wooden box made from plywood, don't need fumigated.
Payment





Payment Term


                  
                   T/T
EXW

30% T/T in advance, paid the balance before shipment
FOB
CFR(C&F)

30% T/T in advance, paid the balance against copy of B/L
CIF
                 L/C
L/C amount above 50,000 usd, we can accept L/C at sight
West Union

Amount lower than 5000usd
West Union
Delivery Time
7~10days after receiving payment for one container
Company Introduction
Contacting Us

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Apparel & Textile Machinery > Textile Machinery > Spinning Machines
Categories
Hi~