KUC711AE101 3BHB004661R0101

KUC711AE101 3BHB004661R0101

USD $1104 - $2014 /Piece

Min.Order:1 Piece

Supply Ability:
74 Piece / Pieces per Month
Payment Terms:
T/T
Delivery Detail:
1 days

Quick Details View All >

Brand Name:
KUC711AE101 3BHB004661R0101
Place of Origin:
China
Model Number:
KUC711AE101 3BHB004661R0101

Temporal Ming sheng automation equipment co., LTD

Business license
Main Products: ABB、GE、MOTOROLA、BENTLY、EMERSON、HIMA、TRICONEX

Product Details

Brand: ABB

Type:KUC711AE101 3BHB004661R0101

Origin: the Swiss

Warranty: 365 days

Colour: new/used

Shipping method: Courier delivery

Personnel and Process Safety A control system is a tool used to control various processes. Responsibility for attaining and maintaining a satisfactory level of safety rests with the personnel who engineer, operate and maintain the equipment. It is important to have an extensive knowledge of all control functions, the inherent safety risks that may be involved in the process, and to possess the imaginative ability to anticipate situations in which accidents may occur. The following Safety Instructions must be observed: • Take care when: – fitting or removing units – connecting or disconnecting cables – resetting or switching units to manual operation • For hazardous locations special restrictions apply, see Appendix E, Standards. • Never connect the equipment to the mains power supply during installation work. • Take extreme care when connecting the system to the mains power supply. Injury or death can be the result of incorrect procedures. • Ensure that all personnel operating or maintaining the installation know the exact location of and how to operate the equipment isolating safety switch and the mains power supply isolating switch. • When the process sub-sections have been checked and a test run has been performed, a person responsible must check the interlocking chains etc. All concerned personnel must be fully informed regarding test runs to be performed.

• Process technicians are to be present when testing and operating process objects. • Never activate any System Initialization push-button if any uncertainty exists regarding exactly what occurs within the system during initialization. ALWAYS CHECK FIRST. • Remember at all times, that the control system can be controlled from a remote engineering station, connected at another node via Control Network. • Remember, the AC 800M Controller will start automatically when voltage is applied.

Contact Supplier

Ms. Chat Now

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Electrical Equipment & Supplies > Other Electrical Equipment
Categories
Hi~