Manufacture Factory Price Whole Set of Solvent Paint Production Line Chemical Machinery Equipment
Negotiable
Min.Order:1
Shandong Longxing Chemical Machinery Group Co., Ltd.
1. Constitute:
This Complete set paint equipment mainly consist of Emulsifying dispersion pot, pipeline emulsifying machine, horizontal sand mill, powder filling tank, liquid meter,air compressor, electric control device and filling machine.
machine.
2.Main Features:
(1) Intergrated Production. The equipment change the traditional craft, and combine the high speed rotating rotor with stator to disperse and emulsify the materials. During the production process, the equipmnet use the liquid metering device to meter the materials, and High shear emulsifying machine to emulsify the materials. It can vacuum suction,vacuum defoaming, semi-automatic filling the finished product.
(2)No dead ends Production. The combined emusifying head which is specially designed to ensure the materials being processed at high, medium and low state.
(3) Completed Confiquration. The user don't need to match other accessoty equipment. Once you connect the power, the machine can be worked.
1. Shandong Longxing Chemical Machinery Group Co., Ltd is not only the professional base for the chemical machinery, but also one of the fixed companies for China National Chemical Equipment Corporation.
2. Our group has the Design License of Special Equipemnt in Grade D1 &D2, the Manufacture License of Special Equipment in Grade A1 &A2.
3. We also have the Maufacturer License of Special Equipment in Heat Transfer Oil Furance, ISO Quality System Certification and the CE Certification.
About Trade Term
Q-----What’s the trade term for making business with us?
A----- FOB; It’s mainly depend on client’s requirement;
About Delivery Time
Q------What’s the Delivery time after placing order ?
A------Usually it takes about 25~30 days after we received your deposit.
However, it would depend on our production line schedule(the timing clients place order)and the manufacturing process of the item.
About Payment Term
Q------What’s the Payment Term?
A------ By T/T.(40% by T/T for an order, the balance to be paid before delivery.
1. Technical Guidance, according to customer’s raw materials and capacity requirement, make the most suitable line and quotation.
2. Visit to our factory and have an investigation and performance test.
3. Engineers available to service machinery overseas.
4. Warranty 1 year, quality guarantee, except wear parts and wrong operation.