Galvanized Scaffolding Square Steel Pipes
Galvanized Scaffolding Square Steel Pipes
Galvanized Scaffolding Square Steel Pipes
Galvanized Scaffolding Square Steel Pipes
Galvanized Scaffolding Square Steel Pipes

Galvanized Scaffolding Square Steel Pipes

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Sichuan Taishenglan Technology Co., Ltd.

Business Type: Government ministry/Bureau/Commission
Main Products: , , ,

Product Details

Pictures
Products Description
Product Name
Hot Finished Structural Hollow Sections/ Square Pipe
Material
Q235 Q345 steel
Surface treatment
Galvanized, 3PE, painting, coating oil, steel stamp, etc.
Usage
construction / building materials steel pipestructure steel pipefence post steel pipe
greenhouse pipe
furniture steel pipefitness equipment steel pipe
Details
Zinc coating: G275
Material: Q355
Radius: 2T-2.5T
Straightness: 1.5mm per meter
TWIST tolerance:+/- 0.05 degree per meter.
Length: 11.7mm, 10.5mm, 9.5mm, 9.075mm, 7.8mm, 4.5mm
Size: 100*100, 120*120,125*125 150*150,
Thickness: 2.0mm, 2.25mm, 2.5mm, 3.0,mm, 4.0mm, 4.5mm, 5.0mm
Zinc Coating
pre galvanized steel pipe: 60-150g/m2
hot dipped galvanized steel pipe:200-400g/m2
Packing
1) Big OD: in bulk
2) Small OD: packed by steel strips
3) Plastic bags
4) According to customer’s requirement
Advantage
1. reasonable price with excellent quality

2, abundant stock and prompt delivery

3, rich supply and export experience, sincere service
Test
Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield
strength, Elongation), Technical Properties (Flattening Test, Flaring Test, Bending Test, Hardness Test, Blow Test, Impact Test
etc), Exterior Size Inspection.
Ends
Plain ends, cutting, threading, bevelled, flange, etc
Payment
30% deposit, balance before shipping out, Western union, money gram, T/T credit card, Alibaba trade Assurance etc
Details Images
FAQ
- - - 1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .
- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).
- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.
- - - 4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .
- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years ,TSX Group do domestic market and export business.
- - - 6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
- - - 7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork
Trade Process

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Timber > Plywoods
Categories
Hi~