Concrete Columns Formwork Panel Mold
Concrete Columns Formwork Panel Mold
Concrete Columns Formwork Panel Mold
Concrete Columns Formwork Panel Mold
Concrete Columns Formwork Panel Mold

Concrete Columns Formwork Panel Mold

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Sichuan Taishenglan Technology Co., Ltd.

Business Type: Government ministry/Bureau/Commission
Main Products: , , ,

Product Details

Product Description
Plastic pp hollow formwork board for construction formwork
Specification
Advantages:

1. Can be reused more than 60 times, very durable

2. Light weight, high strength, high hardness, impact resistance, wear resistance.

3. Demould easily. No need brushing release agent, only tapping, the formwork will fall off, convenient, quick and safe. Shorten working hours and speed up the construction schedule efficiently.

4. Surface is smooth, bright and clean; Concreting and forming effect is good.

5. Easy to process. Sawing, drilling and nailing are all available. Formworks can be combined vertically and horizontally optionally.

6. No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.

7. Good toughness. It could be used as cambered special-shaped formwork.

8. Acid and alkali resistance, corrosion resistance; Very suitable for the engineering application in coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and storing the formwork, which do not pollute the concrete surface.

9. Waste products can be recycled and reprocessed, making full use of waste materials. This property can greatly reduce the project cost compared with wooden formwork and bamboo formwork.

10. Environmental protection and energy saving, no pollution. No any poisonous or harmful gas.

Pictures
FAQ
- -----1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .

- - - 2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).

- - - 3. Q: What's your payment terms?
T/T 30% in advance by T/T ,70% will be before shipment under FOB.
T/T 30% in advance by T/T ,70% against the copy of BL under CIF.
T/T 30% in advance by T/T ,70% LC at sight under CIF.

- - - 4. Q: What's your delivery time?
A: 15-28 days after received the advance payment .

- - - 5. Q: Are you manufacturer or trader?
A: We are the manufacturer of construction materials for decade years
.
- - - 6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

- - - 7. Q: Can you supply other scaffolding materials?
A: Yes Of course. All related construction materials.
(1) Scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)
(2) Scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139
(3) Steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)
(4) Steel coupler (pressed/drop forged coupler)
(5) Steel plank with hooks or without hooks
(6) Steel stair case
(7) Screw adjustable base jack
(8) Construction Metal Formwork

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Formwork
Categories
Hi~