Shanghai Pengpu Shantui 220hp crawler dozer SD22/PD220Y-1 for sale
Negotiable
Min.Order:1
Evangel Industrial (Shanghai) Co., Ltd.
Hot sale hydraulic crawler excavator 350LVS with spare parts for maintenance
SINOMACH hydraulic crawler excavator ZG3365LC-9C with cheap price
SINOMACH 21ton medium-size crawler excavator ZG3210-9C suitable for mining
New 15000kg hydraulic crawler excavator digger XE150D hot sale
Small earthmoving machine XE60 XE60D XE60CA mini crawler excavator hot sale
Shanghai Pengpu Shantui 220hp crawler dozer SD22/PD220Y-1 for sale
Engine | |||||||
Model | Cum mins NT855-C280 | ||||||
Type | Four-stroke, vertical, turbocharged | ||||||
Flywheel power, kW |
162 | ||||||
Rated speed, r/min |
1800 | ||||||
Number of cylinders - bore x stroke, mm | 6-ø139.7 x 152.4 | ||||||
Starting method |
Starting motor 24V, 11kW | ||||||
Battery | 24V (12V x 2), 195 AH | ||||||
Air cleaner |
Dry horizontal type with precleaner | ||||||
Transmission system |
|||||||
Torque converter | 3-element, single-stage, single-phase | ||||||
Transmission | Planetary gear, hydraulic actuated, multiple-disc clutch, forced lubrication by gear pump, 3 forward and 3 reverse speeds | ||||||
Bevel gear | Spiral bevel gear, splash lubricated | ||||||
Steering clutch |
Wet, multiple-disc clutch, spring loaded, hydraulically released | ||||||
Steering brake | Wet, band brake, operated with hydraulic booster and valve inner linkage | ||||||
Final drive |
Spur gear, double reduction, splash lubricated | ||||||
Travel speed, km/h | |||||||
Forward: | |||||||
• 1st | 3.6 | ||||||
• 2nd | 6.5 | ||||||
• 3rd | 11.2 | ||||||
Reverse: | |||||||
• 1st | 4.3 | ||||||
• 2nd | 7.7 | ||||||
• 3rd | 13.2 | ||||||
Under carriage | |||||||
Sprocket | Segmented | ||||||
Track tension | Hydraulic-adjusted | ||||||
Number of track shoes, each side | 6 (4 single, 2 double) | ||||||
* Floating seals are used in all track rollers, carrier rollers, sprocket and front idlers | |||||||
Track | |||||||
Type | Sealed single grouse | ||||||
Track pitch, mm | 216 | ||||||
Track width, mm | 560 | ||||||
Number of track shoes, each side | 38 | ||||||
Lenghth of track on ground, mm |
2730 | ||||||
Ground clearance, mm |
405 | ||||||
Track gauge, mm |
2000 | ||||||
Ground pressure, MPa |
≤0.082 | ||||||
Hydraulic system of work equipment |
|||||||
Working pressure, MPa |
13.7 | ||||||
Rated flow, L/min | 257 | ||||||
Pump | CBT3160 gear pump | ||||||
Control valve | Hand-operated plunger, servo controlling | ||||||
Valve position |
Raise, hold, lower, float | ||||||
Cylinder, Bore x Rod x Stroke, mm | ø120 x ø70 x 1054 |
||||||
Work equipment | |||||||
Blade type | Straight tilt blade | ||||||
Dimensions, Length x Width x Height, mm | 5750 x 3725 x 3575 | ||||||
Weight, kg |
25500 | ||||||
Blade dimensions, Width x Height, mm | 3725 x 1315 | ||||||
Max. lift above ground, mm |
1210 | ||||||
Max. drop below ground, mm |
540 | ||||||
Pitch adjustment, ° | 55 | ||||||
Bit lifting speed, m/s | ≥0.35 | ||||||
Gradeability, ° | ≤30 | ||||||
Max. tilt, mm | 735 | ||||||
Ripper | |||||||
Type | 1 shank | ||||||
Max. dig below ground, mm | 666 | ||||||
Max. lift above ground, mm |
598.3 |
Contact Sales Manager: Teresa Xuan
Mobile/Whatsapp/Wechat: +86 17705652725
Email: teresa (at)