supply of railway handling equipment, 3000 tons of track locomotives, shunting marshalling operation vehicles
USD $142200 - $497800 /Piece
Min.Order:1 Piece
Shandong Dongtie Power Technology Co., Ltd.
coal mine transport locomotive, more than 1000 tons of diesel locomotives, track locomotives
China's 2000 ton diesel locomotive ;high quality railway locomotive hot sale
Railway tank car, train carriage dedicated diesel locomotive
1000 ton diesel locomotive for AAR certified high quality train train compartment
Selling 5,000 tons of train Shunting Locomotive; Railway Oil Tank Wagon
1435mm railway transport vehicle / 2000t shunting locomotive
Shunting locomotive refers to the locomotive used for shunting operations such as train formation, disassembly, line transfer and vehicle pick-up and delivery. It is characterized by frequent starting and stopping.
Chinese name shunting locomotive
Foreign name: flushing local
Function shunting operation
Frequent start and stop of work features
Applied Railway Engineering
Shunting locomotive is the basic power of shunting work, and its technical requirements are different from those of general locomotive. Due to the need to start the traction or push the train set in a short distance, it does not need a higher construction speed, but it needs a certain traction force. Due to the need to move forward or backward frequently, it requires a good look-out condition. Due to the main operation in the station, it needs to pass a curve with a smaller radius, so it requires a small fixed wheelbase of the locomotive, and it often needs to start and stop. Therefore, the locomotive is required to be flexible in operation and good in braking performance. Due to frequent night work, the head and tail lights need good brightness; in addition, it is also required to facilitate the shunting personnel to get on and off safely, etc.
Editor of division of labor
There are two types of shunting locomotive division of labor: one is based on the relatively fixed operation area; the other is based on the relatively fixed operation nature.
When two or more shunting locomotives are equipped in the station with busy shunting operation and more wiring, the relatively fixed operation area of each shunting locomotive shall be divided according to the characteristics of yard setting, shunting operation nature, train flow characteristics and station wiring, etc., which is called shunting area for short.
Generally, only one locomotive operates in a fixed range in each shunting area (except for those with a pre propulsion road in the hump), which can avoid mutual interference and conflict of shunting locomotive operation, facilitate locomotive crew and shunting personnel to be familiar with the characteristics and working conditions of equipment in the operation area, and facilitate shunting safety.
However, for stations with large traffic volume and busy operation, semi-automatic and automatic hump shunting yard is set. In order to improve shunting efficiency and complete shunting tasks in time, semi-automatic and automatic hump shunting yard with two or more shunting machines is set in the same hump or hump tail shunting area. Double push equipment is set at the head of the hump and two or more lead lines (parallel routes) are set at the tail of the hump. Ensure parallel operation between shunting locomotives, reduce cross interference, improve efficiency and ensure safety.
Our services
Provide high quality products and services to meet the needs of customers.
Company information
We are a professional manufacturer, our workers are skilled and experienced. Our products are of good quality and low price. We have a professional international trade team, we can provide you with services: pre-sales and after-sales services.
Common problem
What is the minimum order quantity?
A: one for starting;
What is the delivery time?
A: we will arrange production at the maximum time after receiving the deposit, and ship the goods as soon as possible. Both parties agree.
What are the terms of payment?
A: 30% t / T, balance to B / L copy, you can also choose EXW to pay in cash in USD or RMB.
Can we use our own freight forwarder?
You can do that.
Can you accept OEM service?
Yes, OEM is acceptable. Please email us for more details.
If I want to visit your factory, which is the nearest airport?
Xuzhou International Airport, it only takes two hours from Xuzhou airport to our factory. You can also take the high-speed railway to Zaozhuang high-speed railway station, according to my route, and then take the express train for only one hour. Or we can provide special bus service.
1. We provide free technical support for one year. During the warranty period, if there is any quality problem (except for the easily damaged parts), we will provide you with new accessories through verification.
2. As long as you have any questions about our products, we will provide technical consultation, and we are willing to help you solve any problems at any time.
Packing and delivery
Generally, the package is bare, ratchet belt and splint fixed (size: L * w * h). If the container is too tight, we will use PE film for packaging or packaging according to the special requirements of customers.