High quality YZG/FZG series 304 stainless steel rotary vacuum dryer for pharmacy
Negotiable
Min.Order:1
Hot sale YZG/FZG series PLC control round vacuum drying oven for foodstuff industry
High efficiencyZLB Series high quality Basket Granulator Extruder
Best sale carbon steel EYH-10000A 2D Motion Mixer for Chemical fertilizer solid material
High quality button control Universal Grinding machine for Pesticide industry
Low price energy conservation intensity RLY360 Oil Combustion Hot Air Furnace for Tea
2018 hot sale Pharmaceutical ZS Series Granules/particle Vibrating Sieve
Specification Item | YZG-600 | YZG-800 | YZG-1000 | YZG-1400A | FZG-10 | FZG-15 | FZG-20 | ||||||
Inner Dimension of the Dryer (mm) | Ф600×976 | Ф800×1247 | Ф1000×1527 | Ф1400×2054 | 1500×1060×1220 | 1500×1400×1220 | 1500×1800×1220 | ||||||
Outer Dimension of the Dryer (mm) | 1135×810×1024 | 1700×1045×1335 | 1693×1190×150 | 2386×1675×1920 | 1513×1924×1720 | 1513×1924×2060 | 1513×1924×2500 | ||||||
Qty of Layers | 4 | 4 | 6 | 8 | 5 | 8 | 12 | ||||||
Distance of Layers | 82 | 82 | 102 | 102 | 122 | 122 | 122 | ||||||
Dimension of Tray (mm) | 310×600×45 | 520×410×45 | 520×410×45 | 460×640×45 | 460×640×45 | 460×640×45 | 460×640×45 | ||||||
Qty of Trays | 4 | 8 | 12 | 32 | 20 | 32 | 48 | ||||||
Inside Pressure of Drying Rack (MPa) | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ||||||
Working Temperature of Drying Rack | 35-150 | 35-150 | 35-150 | 35-150 | 35-150 | 35-150 | 35-150 | ||||||
Vacuum Degree of Empty Dryer | -0.09~0.096 | ||||||||||||
Water Evaporation Rate (In the condition of -0.1MPa with temperature of 110°C) (kg/m2·hr) | 7.2 | 7.2 | 7.2 | 7.2 | 7.2 | 7.2 | 7.2 | ||||||
Vacuum Pump (for the dryers with condenser) | 2X-15A 2KW | 2X-30A 3KW | 2X-30A 3KW | 2X-70A 5.5KW | 2X-70A 5.5KW | 2X-70A 5.5KW | 2X-90A 2KW | ||||||
Vacuum Pump (for the dryers without condenser) | SK-0.8 2.2KW | SK-2.7 4KW | SK-3 5.5KW | SK-6 11KW | SK-3 5.5KW | SK-6 11KW | SK-6 11KW | ||||||
Weight(kg) | 250 | 600 | 800 | 1400 | 1400 | 2100 |
Delivery Terms | FOBShanghai. The delivery time is 50 working days from advance payment received and technical drawings confirmed. |
Payment Terms | 50% deposit TT in advance, 50% balance shall be paid by TT before shipment. |
Packing | Seaworthy Packing |
Warranty | The warranty period for non-artificial damage is 1 year after delivery of goods. |