Best sale PLC control YZG/FZG series stevia vacuum belt drying equipment for chemical industry
Negotiable
Min.Order:1
Manufacturer sale PLC control YZG/FZG series liquid vacuum dryer for pharmaceutical industry
Hot sale energy conservation YZG/FZG series food vacuum drying machine for foodstuff industry
Hot sale YZG/FZG series baking oven vacuum belt dryer for pharmaceutical industry
Manufacturer sale 304 stainless steel YZF/FZG series coconut copra dryer for chemical industry
Factory price PLC control YZG/FZG series round vacuum dryer for foodstuff industry
Best sale YZG/FZG series continuous vacuum belt dehydrator machine for chemical industry
Specification Item | YZG-600 | YZG-800 | YZG-1000 | YZG-1400A | FZG-10 | FZG-15 | FZG-20 | ||||||
Inner Dimension of the Dryer (mm) | Ф600×976 | Ф800×1247 | Ф1000×1527 | Ф1400×2054 | 1500×1060×1220 | 1500×1400×1220 | 1500×1800×1220 | ||||||
Outer Dimension of the Dryer (mm) | 1135×810×1024 | 1700×1045×1335 | 1693×1190×150 | 2386×1675×1920 | 1513×1924×1720 | 1513×1924×2060 | 1513×1924×2500 | ||||||
Qty of Layers | 4 | 4 | 6 | 8 | 5 | 8 | 12 | ||||||
Distance of Layers | 82 | 82 | 102 | 102 | 122 | 122 | 122 | ||||||
Dimension of Tray (mm) | 310×600×45 | 520×410×45 | 520×410×45 | 460×640×45 | 460×640×45 | 460×640×45 | 460×640×45 | ||||||
Qty of Trays | 4 | 8 | 12 | 32 | 20 | 32 | 48 | ||||||
Inside Pressure of Drying Rack (MPa) | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ≤0.784 | ||||||
Working Temperature of Drying Rack | 35-150 | 35-150 | 35-150 | 35-150 | 35-150 | 35-150 | 35-150 | ||||||
Vacuum Degree of Empty Dryer | -0.09~0.096 | ||||||||||||
Water Evaporation Rate (In the condition of -0.1MPa with temperature of 110°C) (kg/m2·hr) | 7.2 | 7.2 | 7.2 | 7.2 | 7.2 | 7.2 | 7.2 | ||||||
Vacuum Pump (for the dryers with condenser) | 2X-15A 2KW | 2X-30A 3KW | 2X-30A 3KW | 2X-70A 5.5KW | 2X-70A 5.5KW | 2X-70A 5.5KW | 2X-90A 2KW | ||||||
Vacuum Pump (for the dryers without condenser) | SK-0.8 2.2KW | SK-2.7 4KW | SK-3 5.5KW | SK-6 11KW | SK-3 5.5KW | SK-6 11KW | SK-6 11KW | ||||||
Weight(kg) | 250 | 600 | 800 | 1400 | 1400 | 2100 |
Delivery Terms | FOBShanghai. The delivery time is 50 working days from advance payment received and technical drawings confirmed. |
Payment Terms | 50% deposit TT in advance, 50% balance shall be paid by TT before shipment. |
Packing | Seaworthy Packing |
Warranty | The warranty period for non-artificial damage is 1 year after delivery of goods. |