prefabricated construction large span steel structure warehouse
Negotiable
Min.Order:1
Qingdao Senwang Steel Structure Building Stock Co., Ltd.
Fast assemble Light Steel Frame Shed Steel Structure Warehouse Fabricated Warehouse
Cheap price prefabricated steel warehouse building/ workshop / hangar light steel building
Light Metal Building Industrial Shed Designs Prefabricated Storage Warehouse
Prefabricated used metal building materials industrial shed manufacturers warehouse china
low cost industrial prefab quick build steel structure warehouse building construction
prefabricated construction large span steel structure warehouse:
Material list |
|
Project sample |
Metal Building Construction Projects Industrial Warehouse Free Designs Prefabricated Light Steel Structure |
Building size (m) |
78 x 30 (24) x 8.5 (7) m/ Customized |
Item |
Specification |
Main steel structure |
|
Steel Pillar |
H(300-550)x200x6x10, Steel Q345 |
Steel Beam |
H(300-550)x180x6x8, H300x180x6x8, Steel Q345 |
Second steel structure |
|
Roof Purlin |
C180*75*50*2.5 |
Wall Purlin |
C180*75*50*2.5 |
Cross Support |
20 Round Steel Bar, Steel Q235 |
Column Bracing |
20 Round Steel Bar, Steel Q235 |
Angle Brace |
L50x4 Angle Steel, Steel Q235 |
Tie Bar |
89*3, Steel Q235 |
Roof and wall panel |
|
roof panel |
50mm sandwich panel (EPS, PU, Glass wool, Rock wool) |
Wall panel |
50mm sandwich panel (EPS, PU, Glass wool, Rock wool) |
rolling up door |
auto-matic rolling up door |
Single Wing door |
sandwich panel door |
Window |
Aluminum/PVC sliding window with single glass |
Edge Cover |
steel sheet (thickness 0.5mm) |
Fittings |
glass adhesive, self-tapping screw etc. |
Other fittings |
|
Embedded |
M24 steel Q235, process |
Intensive bolt |
Grade 10.9 |
Ordinary bolt |
4.8S |
Metal Building Construction Projects Industrial Warehouse Prefabricated Light Steel Structure
1) Stable and Earthquake Resistance;
2) Wind resistance;
3) Long using time up to 50 years;
4) Sound insulation;
5) Environment friendly: Most of the excess material can be 100% recycled;
6) Fast construction, time saving and labor saving;
7) Lower cost and maintenance.
I can give you a quoted price if you offer this:
1. Dimension: Length, width, height etc.
2. Doors and windows: Dimension, quantity, position.
3. The material on the roof and the wall.
4. Local climate: Wind speed, snow load, seismic magnitude etc.
5. If you have other requirements, please also inform us.
6. It's better if you have your own drawings .Please send them to me.
All the structure components, panels, bolts and sorts of accessories will be well packedwith standard package suitable for ocean transport and loaded into 40’HQ.
All the products are loaded at the loading site of our factory using crane and forklift byour skilled workers, who will prevent the goods to be damaged.
Good relationship with many vessel companies to make sure the transportation smooth.
1.customized drawing designing free of charge
fessional advice according the site conditions
3.settle transportation affair
*construction stage
1.supply you with detailed construction drawing to guide
2.send one engineer to your local
vide related production for your reference
*After-sale service
1.reasonable advice for usage, maintenance, technically improve
2.unique engineer be in charge of your project
3.on-site servic
We are big group factory and have more than 29 years experience of steel structure workshope project. The first class Design&Engineering Service,excellent product and perfect service has won the praise of customers.
Q:Can you provide product catalog and quotation?
A:We mainly non-standard product processing,you can provide drawings(PDF or CAD),we will give you complete your drawings offer.
Q:what is you used drawing format?
A:pdf/.dwg/.igs./.stp/x_t. etc.
Q:What is the minimun order quantity?
A:No MOQ limited.
Q:What is your packing?
A:Usually wooden case and can be packed as customer’s requested.
Q:How long is the delivery time?
A:According drawing decide some time within 15-30 days after receiving deposit.
Q:What is your payment?
A:T/T and western union.30% deposit and 70% balance should be made before shipment.