cost of prefabricated warehouse construction price
Negotiable
Min.Order:1
Qingdao Senwang Steel Structure Building Stock Co., Ltd.
cost of prefabricated warehouse construction price
1 | Steel Structure Parts (Q235 or Q345) Hot galvanized or painted. | (1). Steel Column: H Section Steel |
(2). Steel Beam: H Section Steel | ||
(3). Withstand Wind Column: H Section Steel | ||
(4). Connected beam: Circular Tube | ||
(5). Roof Purline: cold formed galvanized C Section Steel | ||
or Z Section Steel | ||
(6). Wall purline: cold formed galvanized C Section Steel | ||
or Z Section Steel | ||
(7). End Wall purline: C Section Steel or Z Section Steel | ||
2 | Panel Material parts | (1). External Wall panel: (below is selectable) |
1) 50mm, 75mm or 100mm thickness EPS sandwich panel | ||
2) 50mm, 75mm or 100mm thickness Rockwool sandwich | ||
panel | ||
3) 900# Corrugated Galvanized Steel sheet with different Color | ||
4) Kinds of PVC wall panel. | ||
(2). Internal Wall panel: (below is selectable) | ||
1)50mm, 75mm or 100mm thickness EPS sandwich panel | ||
2) 50mm, 75mm or 100mm thickness Rockwool sandwich | ||
panel | ||
(3). Roofing panel: (below is selectable) | ||
1)50mm, 75mm or 100mm thickness EPS sandwich panel | ||
2)50mm, 75mm or 100mm thickness Rockwool sandwich | ||
panel | ||
3)Corrugated Steel Sheet, and insulating layer if need. | ||
4)Corrugated PVC roof panel. | ||
(4). Skylight: 820# Glass Fiber Reinforced Plastics (FRP) | ||
3 | Door and Window | (1). External Door ( Rolled up door or Sliding door ) |
-1. Over-heat Orbit Sliding Door with double open | ||
-2. Galvanized steel opening by power-operated Roller Door | ||
(2). Internal Door: | ||
50mm Thickness EPS sandwich panel with aluminum alloy door frame | ||
(3). Window: | ||
PVC Window or aluminum alloy window frame with glass. | ||
4 | Drainage parts | (1).Galvanized water channel: |
2mm thickness galvanized steel water channel @ 3000mm or 2440mm/pcs | ||
(2). Down spout: ∅110 PVC Down spout with Accessorie | ||
5 | Connecting Piece | (1) Purline draw bar: ∅12 |
(2) Horizontal Bracing: ∅24 Circular Tube | ||
(3) Knee-Bracing: L Steel | ||
(4) Purline Drive pipe: Φ32*2 | ||
(5) Column Bracing: ∅24 Circular Tube | ||
6 | Others | (1) Ventilating device |
(2) Crane beam | ||
(3) Canopy | ||
(4) Bolt: Foundation bolt, High strengthen bolt, Normal bolts. | ||
Product show
Our factory have independent design institute and the Design qualification is the grade one .excellent design and the perfect price Beyond your imagination .If you want to a perfect warehouse and please provide to us that information wihich as follows;
Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)
_____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
we are big group factory and have more than 25 years experience of steel structure workshope project The first design&Engineering Service,Excellent product and perfect Has won the praise of customers and want to cooperation with more and more friends and customer add us team .
1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!
2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical
3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.
4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.
5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)