High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media
High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media
High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media
High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media
High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media

High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Wuxi Respect Trade Co., Ltd.

Business Type: Manufacturer
Main Products: , , ,

Product Details

Specification
High quality PVC film fill pack,Corrosion preventive 1000*850mm cooling tower infill media
Setting Information
Size(mm)
850/1000/1300*1000
Fills Width
850/1000/1300
Fills height
1000mm
Fill thickness
0.3
Pitch Distance
14.5
Material
PVC
cooling type
cross flow
model number
CTF
Product Description
The efficiency of a cooling tower depends upon its fill, the fill is made of rigid PVC or PP film of flameretardant quality with high heat exchange efficiency.
The high efficiency fill reduces the motor input HP and assures uniform distribution of water, with minimum resistance to air flow.
Below roll fillings is applied to Newin brand counter flow round type & square type cooling towers, block/sheet fillings is applied to cross flow square type cooling towers.


Product Details

Square pvc cooling tower fills using high quality PVC with 43% oxygen index.
The heat sinks is designed by 20mm high special inclined ladder splash wave shape.
The area of single-chip heat sinks growth rate could reach above 200%.
The range of bearing temperature is -35°C~60°C.
Under pumping pressure:3.0KN/M
Volume aproll coefficient:25000

Installation Process
Mould
Packing
FAQ

Q1. Can I have a sample order for cooling tower fill?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q2. What about the lead time?

A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than 

Q3. Do you have any MOQ limit for Cooling tower fills order?

A: Low MOQ, 1pc for sample checking is available

Q4. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT of samples It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q5. How to proceed an order for custom shape fills?

A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.

Q7: Do you offer guarantee for the products?

A: Yes, we offer 18 months warranty to our products.

Q8: How to deal with the faulty?

A: Firstly, Our products are produced in strict quality control system and the defective rate will be less
than 0.2%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution i
ncluding re-call according to real situation.

Contact

Welcome To Contact With Me!
If you have any need for cooling tower components, such as cooling tower fill, drift eliminator, mist eliminator, cooling tower spray nozzle and so on, please don't hesitate to contact with us. In here, each penny is count and you will get high quality products and good service. We trust, good quality and service are the basic of long term business.https://rsbk123.en.china.cn/contactinfo.html?spm=a2700.icbuShop.88.28.b31a69caib6r80

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Refrigeration & Heat Exchange Equipment > Cooling Tower
Categories
Hi~