Custom Alumnium Swing Door
USD $34 - $100 /Square Meter
Min.Order:20 Square Meters
Foshan City Heyi Door Window Factory
the Custom Alumnium Swing Door.
We are the 1st door window professional manufacturer verified by "China Suppliers".
Don't click "Chat Now". It can not reach us. Negotiate by the email:
xiao18316573143@163.com
Mobile phone (wechat):86-131 3822 8769
Our product series | |||
Aluminum door | Wood door | Aluminium window | Aluminium glass sunroom |
swing door | swing door | casement | |
sliding door | with glass | sliding window | |
folding door | folding window | ||
pivot door | top hung (awning window) | ||
bottom hung (tilt and turn window) | |||
fixed window (arch, triangle, round) |
Finish: powder coating, elecplating, etc.
Various glasses are optional.
Aluminum alloy doors and windows are common in daily life, so what we often call swing door is actually related to the installation method of hinges. Different door opening methods are naturally different. How to assemble the aluminum alloy swing door?
Method / step
Take out the swing door, open the lock tongue, rotate the door leaf to form a vertical angle with the door frame, take out the door leaf upward and place it.
Install the lock and adjust it until the switch is free and meets the standard.
Install the door leaf and put the whole door into the entry hole.
Adjust the gap and flatness, whether the lock can lock normally, and pad the frame where the door hinge is located a little higher.
Punch holes according to the installed holes on the door frame, fix the door frame with expansion screws, slightly adjust to the best effect, and block the holes on the door frame with rubber particles.
When the peripheral gap is too large, it shall be filled with sealant and other substances.
matters needing attention
Attention shall be paid to the assembly quality when assembling the swing door, the joint shall be flat, and the frame leaf shall not be split or channeled.
The surface is polluted and bitten, and the finished product is not protected during construction, and it is not cleaned in time.
If the surface is scratched, it shall be strictly prevented from cleaning the dirt on the flat surface with a hard object.
The glass cutting size is not well controlled, and the size is not measured according to the real object. After cutting, it does not meet the installation requirements, which is too large or too small.
If the mortar and sundries in the notch are not cleaned up, the cleaning shall be carefully controlled. No glass shall be installed without inspection.
If the nylon wool and rubber strips are lost or the length is not in place, the sealing materials shall be selected according to the design requirements, and they shall be replaced in time after they are lost.
Improper selection of rubber strip leads to poor sealing effect, and the sealing rubber strip is easy to disengage at the corner. Glue shall be applied under the sealing strip to make it firmly combined with glass and frame fan.
If the glass is unclean or cracked, clean it with soft cloth or cotton thread in time after installation to achieve transparency and brightness. Replace the cracked glass in time.