TKBZT-Ⅲ-5000KVA Transformer Comprehensive Performance Test Bench
Negotiable /Piece
Min.Order:1 Piece
Wuhan Guodian Mingke Electric Co., Ltd.
TKBZT-III-5000KVA transformer comprehensive test system complies with relevant national standards such as GB1094, GB/T4776, GB/T5169 and so on. The comprehensive performance test benches for transformers produced by our company mainly
It is to test the no-load and load characteristics of power transformers and distribution transformers. It can also perform frequency multiplication induction and power frequency withstand voltage tests on the tested transformer. TKBZT-II-500KVA transformer comprehensive
The performance test bench system is based on the power supply system testing and spot-checking the transformer performance and parameter testing, the transformer manufacturer’s production process testing and the finished product factory testing and testing, and the design and modification of the scientific research testing unit
Manufacture transformers to verify its design, provide accurate parameters and data, and oriented research and development to meet the needs of different units such as industrial and mining, and design a testing and test system that integrates multiple test functions of transformers. The system is suitable for
High voltage 10kV, 35kV low voltage 400V capacity 5000kVA and below transformer factory test and voltage 10kV capacity 3150kVA and below distribution transformer no-load test, load test, transformation ratio measurement,
DC resistance measurement, power frequency withstand voltage test, and induction withstand voltage test are integrated, digitized, and reduce mechanical failures and reading errors. At the same time, it improves the accuracy and fitness of the overall test system.
Usability makes the factory test easier and faster.
The TKBZT-II-5000KVA transformer comprehensive performance test bench adds other functions to the original transformer comprehensive test bench, making the system more intelligent, modern, and more operational.
Simple and convenient. This system is also a manifestation of the strength of transformer manufacturers. The system has two operating modes (two operating modes are interlocked, and can only work in one operating mode), reserved
The original button operation mode of the transformer comprehensive test bench adds a microcomputer operation mode. This operation mode only needs to click the mouse on the computer monitor to complete the test. All operations are executed with PL in the system
C starts its command execution unit and completes the test. In addition, the system is also equipped with a video surveillance system to monitor its test area, making it safer and more reliable. The system integrates test-once wiring and test control
, Monitoring, measurement, protection, display, data acquisition, analysis and processing, measurement control, storage, printing, and protection. The whole test process is completed automatically, with high efficiency and high precision.
Out the advantages.