500L-1000L Bright Beer Tank/Brite Tank/Conditioning Tank
USD $1 - $100 /Set
Min.Order:1 Set
Shandong Yuesheng Beer Equipment Co., Ltd.
500L-1000L Bright Beer Tank/Brite Tank/Conditioning Tank
1000L brewery equipment/1000L brewery equipment
PRODUCT PARAMETERS
Sanitary Stainless steel 304, effective capacity: 500L~1000L, 25% top head,.
dome top head;
Mirror inside polishing, Surface brushed, welding line polish sanding light belt;
Polyurethane insulation, thickness: 100mm; inner body thickness 3mm, cladding thickness 2mm;
Dimple type glycol cooling jacket, cooling jacket thickness is 1.5mm;
Top manhole, With rotary CIP arm;
temperature sensor on bottom cone side cylinder slightly top position,
Sample valve in the cylinder, carbonation port on cylinder and one miscellaneous port,
lifting lug
Mechanical pressure valve; Pressure gauge;
Glycol solenoid valves, with screw assembly to adjust leg height;
Complete with associated valves and fittings.
Feature
Equipment List | Main part | Specific information |
Mil | Malt Mill | 100Kg/h~2000kg/h |
Mashing | Mash/Lauter tun kettle/Whirlpool tank Hot water tank Wort Pump Hot water pump Heat Exchanger Wort Oxygenate Assembly Sanchorometer Titanium Stick Survey Barrel | 50L-200HL 3m3/h-20m3/h, 3m3/h-20m3/h,
|
Fermentation | 50L-200HL
| |
CIP Cleaning | Sterilization Tank Alkali Liquor Tank CIP Pump | 50L-2000L |
Cooling |
Glycol Tank Chiller Ice Water pump | 500L-20000L 3HP-50HP |
Control | Control Cabinet Digital Controller | 700×400×2000C2015
|
Brewery equipment of standard configuration
daily output | 100L | 200L | 300L | 500 | 1000L | 2000L |
unit type | YS-100 | YS-200 | YS-300 | YS-500 | YS-1000 | YS-2000 |
floor space | 15square | 25square | 35square | 45square | 80square | 120square |
power | 8KW | 12KW | 20KW | 35KW | 35/15KW | 65/15KW |
Application of Pub/Hotel/Restaurant Beer Brewery
Widely use for home hobby, pub, bar, restaurant, hotel, teaching test equipment, micro, medium factory, etc.
Quality control of Brewery equipment
1. After receiving the order, we will hand over the technical personnel to design the equipment drawings. After the drawings are completed, they will be submitted to the cheif engineer for review. If there is no problem, they will be submitted to the customer for review;
2. before the production,, technical staff, seller and procurement, production department, etc. will discuss the technical details of the equipment; If no problem, hand in the drawings, the technical list to the production and procurement department;
3. In the production process, the quality inspection personnel will regularly check the production details of the equipment and re-qualify the production;
4. When the equipment is completed, it will be inspected by the quality inspectors.
How to test, how to test, quality control, quality control of finished products?
1. Pipe connection, water test for 24 hours
2. The inner cone is polished to 0.4μm, and the inner cylinder and the outer cone are protected by the surface; the inner and outer of the dish-shaped head, the outer cover and the outer cylinder are sandblasted;
3. After the production is completed, the cylinder is filled with water for leak test, and the jacket is subjected to water and pressure test, and the test pressure is 0.4 MPa;
Trade term
T/T, L/C,
Leading period: 30 working days after deposit,
Advantages of Pub/Hotel/Restaurant Beer Brewery
1. Workshop: Advanced production equipment and the workers with high production technology and rich production experience
2. Efficiency and professional sales teams;
3. Engineer not only has rich beer brewing and design experience;
4. High and Strict quality control system with accurate testing tools: All the tank will do water and pressure test when finishing. Pressure test is 2-4bar; Machine has been adjusted before delivery.
5. Engineer oversea installation support, We supply turnkey brewery including installation; Our engineer will go to install the brewery when finishing
6. Adopting advanced world famous brand components in pneumatic parts , electric parts and operation parts.
7. customers designed support;
8. Service:Free training course at our plant. Free parts support within warrantee period.
We will provide the consumable parts at an agency price out of guarantee period
24 hours on line service each day, free technical support. We will solve your problems
9. The English operation manual in electronic edition is included.