Bottle Labeler
USD $1 - $100 /Set
Min.Order:1 Set
Shandong Yuesheng Beer Equipment Co., Ltd.
PRODUCT PARAMETERS
To adapt to the product size: φ15mm~φ150 mm;
Labeling speed: 5-10 per minute(Related to the product size);
Outer dimension: 920mm×450mm×500mm;
Power: 220V/50HZ;
Total weight: 35kg;
Feature
Equipment List | Main part | Specific information |
Mil | Malt Mill | 100Kg/h~2000kg/h |
Mashing | Mash/Lauter tun kettle/Whirlpool tank Hot water tank Wort Pump Hot water pump Heat Exchanger Wort Oxygenate Assembly Sanchorometer Titanium Stick Survey Barrel | 50L-200HL 3m3/h-20m3/h, 3m3/h-20m3/h,
|
Fermentation | Fermentation Tank | 50L-200HL
|
CIP Cleaning | Alkali Liquor Tank CIP Pump | 50L-2000L |
Cooling |
Glycol Tank Chiller Ice Water pump | 500L-20000L 3HP-50HP |
Control | Control Cabinet Digital Controller | 700×400×2000C2015
|
Brewery equipment of standard configuration
daily output | 100L | 200L | 300L | 500 | 1000L | 2000L |
unit type | YS-100 | YS-200 | YS-300 | YS-500 | YS-1000 | YS-2000 |
floor space | 15square | 25square | 35square | 45square | 80square | 120square |
power | 8KW | 12KW | 20KW | 35KW | 35/15KW | 65/15KW |
Application of Pub/Hotel/Restaurant Beer Brewery
Widely use for home hobby, pub, bar, restaurant, hotel, teaching test equipment, micro, medium factory, etc.
Quality control of Commercial beer brewing equipment
1. After receiving the order, we will hand over the technical personnel to design the equipment drawings. After the drawings are completed, they will be submitted to the cheif engineer for review. If there is no problem, they will be submitted to the customer for review;
2. before the production,, technical staff, seller and procurement, production department, etc. will discuss the technical details of the equipment; If no problem, hand in the drawings, the technical list to the production and procurement department;
3. In the production process, the quality inspection personnel will regularly check the production details of the equipment and re-qualify the production;
4. When the equipment is completed, it will be inspected by the quality inspectors.
How to test, how to test, quality control, quality control of finished products?
1. Pipe connection, water test for 24 hours
2. The inner cone is polished to 0.4μm, and the inner cylinder and the outer cone are protected by the surface; the inner and outer of the dish-shaped head, the outer cover and the outer cylinder are sandblasted;
3. After the production is completed, the cylinder is filled with water for leak test, and the jacket is subjected to water and pressure test, and the test pressure is 0.4 MPa;
Trade term
T/T, L/C,
Leading period: 30 working days after deposit,
Our service
1. Three year quality guaranty, the machine with main parts(excluding the consumables)
shall be changed free of charge when problems happened during the warranty period.
2. Lifetime maintenance free of charge.
3. Free training course at our plant.
4. Field maintenance and repair service, engineer available to service machinery overseas;
5. We will provide the consumable parts at an agency price when you need replacement.
6.24 hours on line service each day, free technical support. We will solve your problems
Immediately by E-mail, fax, MSN, Skype ,telephone.
7. The English operation manual in electronic edition is included.
8. Machine has been adjusted before delivery.
Advantages of Pub/Hotel/Restaurant Beer Brewery
1. Workshop: Advanced production equipment and the workers with high production technology and rich production experience
2. Efficiency and professional sales teams;
3. Engineer not only has rich beer brewing and design experience;
4. High and Strict quality control system with accurate testing tools: All the tank will do water and pressure test when finishing. Pressure test is 2-4bar; Machine has been adjusted before delivery.
5. Engineer oversea installation support, We supply turnkey brewery including installation; Our engineer will go to install the brewery when finishing
6. Adopting advanced world famous brand components in pneumatic parts , electric parts and operation parts.
7. customers designed support;
8. Service:Free training course at our plant. Free parts support within warrantee period.
We will provide the consumable parts at an agency price out of guarantee period
24 hours on line service each day, free technical support. We will solve your problems
9. The English operation manual in electronic edition is included.