K19 diesel engine spare parts stainless steel engine expansion plug 175830
USD $3.2 - $15 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
diesel Engine spare parts K38 kta38 metal flat washer 3178457 Idler Gears Plain Washer
construction machinery diesel Engine Part ISM QSM M11 Gear Housing Cover 3400811
dongfeng truck Diesel engine parts 6BT engine flywheel assy 3912907 flywheel with gear ring
Foton truck ISF3.8 engine oil pan 5257821 5257823 Original/Aftermarket diesel engine parts
Foton truck diesel Engine Parts ISF3.8 Valve Chamber Cover 5262617 for sale rubber valve cover
marine diesel engine parts KTA19 dowel 67211 ring dowel 124921
Products Description
K19 diesel engine spare parts stainless steel engine expansion plug 175830 | |||
Part name | engine plug | Part number | 175830 |
Brand | dongfeng | Quality | Guranteed |
MOQ | 6 pcs | Application | dongfeng truck |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other k19 engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |