Diesel marine engine parts haxagon head screw S144 for KTA19 cylinder block parts
USD $8.3 - $9.5 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
diesel engine parts K19 KTA19 lock washer S603 marine boat engine spare parts
KTA19 Diesel marine engine parts captive capscrew 3033822 threaded bolt with washer
marine boat diesel engine parts idler shaft 3202114 KTA19 engine shaft idler
marine boat engine parts KTA19 K19 crankshaft gear 207259 gear crankshaft
Auto parts 6CT8.3 diesel engine turbocharger double headed screw 3818823 double ended screw bolt
Products Description
Diesel marine engine parts haxagon head screw S144 for KTA19 cylinder block parts | |||
Part name | capscrew | Part number | S144 |
Brand | KTA19 | Quality | Guranteed |
MOQ | 1 pcs | Application | truck |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |