construction machinery engine spare parts K38 KTA38 KTA50 engine fan belt 3003343
USD $19.3 - $29 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
ISDE diesel engine spare parts QSB6.7 fan belt tensioner 3973820
heavy truck NT855 Diesel engine spare parts v belt 178662 Hot sale
Diesel engine parts NT855 accessory drive belt pulley 3013336
high quality diesel engine parts M11 QSM11 motor starter 39MT 24v 5284084 for construction machinery
high quality KTA38-G4 Generator parts diesel engine v belt 3031485
Products Description
construction machinery engine spare parts K38 KTA38 KTA50 engine fan belt 3003343 | |||
Part name | engine fan belt | Part number | 3003343 |
Brand | dongfeng | Quality | Guranteed |
MOQ | 6 pcs | Application | machinery engine |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other k19 engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |