high quality Dongfeng engine spare parts 6BT5.9 Belt tensioner 5333477
USD $15 - $15 /Piece
Min.Order:1 Piece
Shiyan Sanfeng Auto Parts Co., Ltd.
ISF2.8 ISF3.8 diesel engine spare parts belt tensioner 5287021
high quality Dongfeng 6CT engine belt tensioner 3936213 for sale
High quality ISDE diesel engine parts belt tensioner 4936440
marine engine parts NT855 Diesel engine wear sleeve 190397 Wear-resistant bushing
Diesel engine parts 6BT5.9 engine fan blade rubber 3900083 diameter 540mm
machinery parts 4BT Water tank radiator water cooling radiator for generator set
Products Description
high quality Dongfeng engine spare parts 6BT5.9 Belt tensioner 5333477 | |||
Part name | belt tensioner | Part number | 5333477 |
Brand | dongfeng | Quality | Guranteed |
MOQ | 6 pcs | Application | truck |
sample | available | warranty | 6 months |
place of origin | Shiyan,hubei | Packing | bags,carcon box,wooden case or as requested |
shipping time | 3-7days after receiving the payment | Payment | T/T Paypal Western Union Trade assurance |
Related Products
Other engine parts | ||
engine piston | 6pcs | 3096681 3096682 |
cylinder liner | 6pcs | 4009220 |
piston ring | 6 sets | 4089500 |
main bearing | 1 set | AR-12270 |
connecting rod bearing | 1 set | 205840 |
camshaft bushing | 7 pcs | 3002834 |
Repair kits | upper & lower | 3800728 3801007 |
engine gas valve | intake&exhaust | 3035110 207241 |
SHIYAN SANFENG We specialize in diesel engine parts,the engine modle includes dongfeng parts 6BT,6CT,6LT;Electronic control series ISBE,ISDE,ISLE;Chongqing parts NTA855,K series,Xi'an parts ISM11,Foton parts ISF2.8/3.8 and engineering machinery QSB5.9,QSM11,QSX15. Welcome new and old customers to visit and negotiation. |
exhibition Shanghai Automechanika from 2012 to now on |
Packaging | Carcon box, wooden case, or as customers' requirements |
Shiping way | by express, by air,by sea |
Principle | for small order, we can only accept 100% in asvance |
substanitial order 50% advanced payment can be accepted | |
shipping at any port in China, depends on negotiation | |
Production time | after receiving the payment(usually takes 3 days),we prepare the goods for you |
Delivery time | depends on the shipping way |