20m heavy duty motorized lifting telescopic mast electric crank up pole 200kg load
USD $3,100 - $3,100 /Unit
Min.Order:2 Units
Dingzhou City Great Wall Daily Chemical Factory
9m vehicle mounted electric telescopic mast motorized crank up pole tripod light mast
6m electric tripod telescoping light pole fast extending telescopic lamp mast
10m hand and motor lifting lead screws electrical telescopic mast
6m-20m electric mobile telecommunication antenna telescopic mast tower
20m heavy duty motorized lifting telescopic mast electric crank up pole 200kg load
20m heavy duty motorized lifting telescopic mast electric crank up pole 200kg load
Basic specifications
Product name | 20m heavy duty motorized lifting telescopic mast electric crank up pole 200kg load |
Closed length | 3.70m (Bottom base included) |
Extended length | 20.0m (Bottom base included) |
Max.payload | 200kgs |
Lifting method | motorized lifting |
OD | 98-230mm |
Material | aluminum alloy |
Section | 7 |
Finish | painting |
Color | Army green |
Color: the whole unit will be in white when closed, but when extended, the main pole will be in origin color of aluminum alloy only with top 4cm of each pole section in army green color.
Accessories available
One unit of 20m heavy duty telescopic mast to be wrapped with Poly tapes then to be packed into a plywood case
Specification table of masts
No. | Model | Closed Length | Extended Length | OD | Section | Payload |
002 | TAL-2M-30 | 1.0m | 2m | 40mm~60mm | 3 | 30kg |
002 | TAL-2M-30 | 0.75m | 2m | 40mm~90mm | 6 | 20kg |
002 | TAL-2M-100 | 1.2m | 2m | 105mm~130mm | 2 | 100kg |
003 | TAL-3M-250 | 1.75m | 3m | 90mm~130mm | 3 | 250kg |
004 | TAL-4M-250 | 1.8m | 4m | 90mm~130mm | 3 | 250kg |
004 | TAL-4M-10 | 1.55m | 4m | 40mm~80mm | 4 | 10kg |
004 | TAL-4M-50 | 1.2m | 4m | 60mm~130mm | 6 | 50kg |
005 | TAL-5M-150 | 1.4m | 5m | 60mm~160mm | 6 | 150kg |
005 | TAL-5M-600 | 1.6m | 5m | 60mm~150mm | 5 | 600kg |
006 | TAL-6M-10 | 1.7m | 6m | 40mm~90mm | 6 | 10kg |
006 | TAL-6M-50 | 1.7m | 6m | 50mm~105mm | 6 | 50kg |
008 | TAL-8M-30 | 2.2m | 8m | 40mm~105mm | 6 | 30kg |
010 | TAL-10M-30 | 2.45m | 10m | 40mm~105mm | 7 | 30kg |
012 | TAL-12M-200 | 2.45m | 12m | 70mm~160mm | 7 | 200kg |
012 | TAL-12M-35 | 2.3m | 12m | 40mm~130mm | 7 | 35kg |
012 | TAL-12M-100 | 2.7m | 12m | 50mm~130mm | 7 | 100kg |
012 | TAL-12M-20 | 2.4m | 12m | 40mm~150mm | 7 | 20kg |
015 | TAL-15M-20 | 2.8m | 15m | 40mm~105mm | 7 | 20kg |
015 | TAL-15M-30 | 2.8m | 15m | 50mm~130mm | 7 | 30kg |
015 | TAL-15M-300 | 2.7m | 15m | 60mm~155mm | 7 | 300kg |
020 | TAL-20M-200 | 3.7m | 20m | 70mm~230mm | 7 | 200kg |
025 | TAL-25M-80 | 3.4m | 25m | 60mm~230mm | 10 | 80kg |
025 | TAL-25M-60 | 3.4m | 25m | 60mm~210mm | 10 | 60kg |
028 | TAL-28M-15 | 3.7m | 28.5m | 30mm~130mm | 10 | 15kg |
035 | TAL-35M-10 | 3.9m | 35m | 30mm~180mm | 11 | 10kg |
Installation Method
1.if mount mast on vehicle,just need car clamps to fix. If mount on ground,fix the base and tripod with stainless steel stakes,
2.Determine the mounting position of telescopic mast if manual and motorized mast hitting one ground anchor per 120 degrees. If pneumatic mast in 90 degree to fix the Guy rope.
3.Mount lifting handle bar to raise up manual mast. If pneumatic or motorized, use air compressors/foot pump and motor. But if motorized one, hand crank also work.
Mast Operation Precautions
l No overloading.
l Ensure the area in which the mast is deployed is free of obstructions and overhead power
lines.
l For motorized mast :The crank handle of mast must be disengaged when operated
electrically.
l For pneumatic mast:DO NOT remove any of the exhaust valves in an attempt to retract the
mast quicker, this action removes control over the rate of decent.
l For motorized mast:When operated manually, the motorized telescopic antenna mast must
Be in a power off state.
l Any abnormal phenomena( such as inflexible or stuck) occurs when lifting, you should
stop it immediately, identify the reasons, and lift it after cleaning troubles.
l Operating environment requirements:
l working temperature: pneumatic mast -15--+60℃. manual and motorized mast -50--+60℃.
l Wind load: 50-80km/(without Guy rope ), 100-120Km/h( with Guy rope)
l Note: if special request, please confirm with our technician.
Maintenance
l Waterproof and dust proof cover should be put into outdoor storage
l If there is a situation that is not smooth or obvious noise during lifting mast,add lubricating
oil to make sure inner Mechanical parts work well. Suggest to add oil to the mast every 2-3 month.
l Regularly check the connection parts in normal condition.
l Change seals easily on regular time can make mast in good using conditions after
using 20thousand times.
Contact
Ms. Karen Wang | ||
Talents Enterprise Company Limited | ||
T: 86 22 28376666 | F: 86 22 28376667 | | ||
whatsapp:0086 182 0221 3131 | ||
W: |