dx51d z100cold rolled galvanized steel sheet in coil slitting machine
USD $700 - $900 /Ton
Min.Order:5 Tons
astm a36 q235 q345 ss400 hot rolled steel coil and best cheaper price
Top 10 prepaint andcoated color galvanized steel coil and low price
Astm a36 Baotou Black Carbon Steel Hot Rolled Coil Manufacturers Tianjin
3mm a36 iron alloy a572 1500mm hr hot rolled steel coil in steel sheet
s235jr st37 q235b 1219mm mild low carbon iron metal steel coil ms steel coil
ss400 ss400 cr ms hot rolled iron metal steel coil types of steel coils
Product Description
Specification | ||||||||||||
Thickness: 0.01mm-4mm | ||||||||||||
Width: 1000mm-1500mm | ||||||||||||
Grade: DX51D + Z(ZINC); SGCC, DX52D, DX53D, DX54D, BGH340, SGH440, SGC340 | ||||||||||||
Stock thickness: 0.5mm-4mm | ||||||||||||
Stock width:1250mm/1500mm | ||||||||||||
0.5MM, 0.6, 0.75, 0.8, 1.0, 1.2, 1.5, 1.75, 1.8, 1.95, 2.0, 2.2, 2.3, 2.5, 2.75, 3.0, 3.5., 3.75, 3.95, 4.0mm | ||||||||||||
Each coil weight : 5 - 12tons |
Chemical composition | ||||||
C | Mn | Si | P | S | AL | |
SPCC | ≤0.15 | ≤0.50 | ≤0.05 | ≤0.035 | ≤0.025 | --- |
SPCD | ≤0.10 | ≤0.45 | ≤0.03 | ≤0.025 | ≤0.025 | >0.015 |
SPCE | ≤0.08 | ≤0.40 | ≤0.025 | ≤0.025 | ≤0.025 | >0.015 |
Technical property | |||||||||
GRADE | Yield Strength MPA > | Tensile Strength MPA ≤ | Elongation | ||||||
% (MM) | |||||||||
≤0.25MM | 0.25-0.30 | 0.30-0.40 | 0.40-0.60 | 0.60-1.0 | 1.0-1.6 | > 1.6 | |||
SPCC | --- | 270 | 25 | 28 | 31 | 34 | 36 | 37 | 38 |
SPCD | 240 | 270 | 27 | 30 | 33 | 36 | 38 | 39 | 40 |
SPCE | 220 | 270 | 29 | 32 | 35 | 36 | 40 | 41 | 42 |
Detailed Images
Fabeication service
1.Cut steel coils into steel sheet, cut to length, cut to any length.
2.Width cut and slit into small width.
3.One coil is about 22-29tons, some country seaport can not load so large coils, so need separate large coil into 3- 5 small coils.
FAQ
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. What is your payment terms?
L/C, D/A, D/P, T/T, Western Union and MoneyGram.
Related Products