Competitive price hot rolled carbon steel coil with boron
USD $500 - $800 /Ton
Min.Order:5 Tons
Competitive price hot rolled carbon steel coil with boron
product show
| |||||||||||||||||||||||||
Thickness: 1.2mm-25mm | |||||||||||||||||||||||||
Width: 1250mm-2000mm | |||||||||||||||||||||||||
Grade: Q235B, SS400, A36, S235JR, A283 GR.Cmild steel | |||||||||||||||||||||||||
Q345B, A572GR50, S355JR, ST52 Low alloy | |||||||||||||||||||||||||
Stock thickness: 1.5mm, 1.8mm, 2.0mm, 2.5mm, 3mm, 4mm,5mm, 6mm, 7.5mm,8mm, 9.5mm, |
2.Technical property | |||||||||
GRADE | Yield Strength MPA > | Tensile Strength MPA ≤ | Elongation | ||||||
% (MM) | |||||||||
≤0.25MM | 0.25-0.30 | 0.30-0.40 | 0.40-0.60 | 0.60-1.0 | 1.0-1.6 | > 1.6 | |||
SPCC | --- | 270 | 25 | 28 | 31 | 34 | 36 | 37 | 38 |
SPCD | 240 | 270 | 27 | 30 | 33 | 36 | 38 | 39 | 40 |
SPCE | 220 | 270 | 29 | 32 | 35 | 36 | 40 | 41 | 42 |
Fabeication service
1.Cut steel coils into steel sheet, cut to length, cut to any length.
2.Width cut and slit into small width.
3.One coil is about 22-29tons, some country seaport can not load so large coils
so need separate large coil into 3- 5 small coils.
Production process
Packaging & Shipping
1. In bundles, each bundle weight less than 3 tons
2. in steel pallet with anti-rust paper, each pallet under 3 tons
3. in wood pallet with anti-rust paper, each pallet under 3 tons
Our factory
1. How long can make delivery?
For stock products, will make shipments in 3-5days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 20-25days to make shipment.
2. What is your payment terms?
L/C, D/A, D/P, T/T, Western Union and Money Gram.
3.Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.