30*2000*6000MM carbon hot rolled steel plate hardness ss400 st42 2 a36 with delivery time 1 day
USD $119.09 - $1,982.45
Min.Order:1
Delivery time 1 day 6MM*1250*4000MM raw material mild steel plate with competitive price per ton
Tianjin support cnc machining service 310 price stainless steel sheet and plates metal
3MM*1500*4000MM abrasion resistant a36 modified steel plate sheet with 1 day delivery time
custom metal fabrication steel plate cutting stainless steel cutting disc
4MM standard thickness*1250*4000MM astm a36 st37 q235b steel plate with delivery time 1 day
Tolerance | Standard tolerance |
Standard | GB,AISI,ASTM,JIS,DIN,API |
Technical | Hot rolled |
Surface | Coated |
Application | Used for bridge and construction riveting, bolted and welded structure, as well as general purpose structural steel quality of carbon steel, steel plate and bar steel. |
Place of origin | Tianjin,China |
Certification | API,CE,ISO,SGS |
Payment | T/T , L/C , Western Union |
Packing | 1.In bundles 2.Standard export packing 3.According to customer's requirements. |
Delivery detail | Normally 1 working days after get deposits or according to quantity |
Advantage | 1. Reasonable price with excellent quality 2. Abundant stock and prompt delivery 3. Rich supply and export experience, sincere service |
MOQ | 1 piece |
1. Steel coils picture for details:
2.Shipment and packing:
3. Our factory:
4.Our certificate:
5.Related production:
(1)Cold rolled steel coils cut to plate
Thickness: 0.5mm-3.0mm width: 800mm/1250mm
(2)Galvanized steel plate
Galvanized steel coils cut to plate
Thickness: 0.1mm-2.5mm width: 600mm/800mm/1250mm
(3) Al-zinc coils and plate
(4)Seamless steel pipe, seamless steel tube, seamless pipe, Hollow bar sizes: outer diameter: 8mm-800mm, wall thickness: 1mm-80mm
(5) Round bar
Material: S235JR, 1045, 1018, 1518, 1020, 41040, 4340, 8620 and other materials
Diameters: 3mm- 800mm
(6)steel profile
angle bar; channel bar; h beam; rectangular tubes
6.steel plate cutting and processing:
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
Low alloy hot rolled s235jr en 10025 s335j2 n steel plate