6MM*1250*4000MM q235b wear-resistant mild ms different types steel plate sheet with competitive price and delivery time 1 day
USD $139.5 - $156.98
Min.Order:1
16*2000*6000MM s235jrg2 mild iron 16mm thickness steel wear plate sheet with delivery time 1 day
6MM*1250*4000MM q345b astm a572 gr50 manganese the steel 6mm plate with delivery time 1 day
3MM*1500*4000MM low temperature carbon alloy st52-3 steel plate with delivery time 1 day
5MM*1500*6000MM s335jr st52 hot rolled pressure vessel steel plate with delivery time 1 day
AISI Inox sus 304 hr hot rolled stainless steel sheet processing cutting parts
Tolerance | Standard tolerance |
Standard | GB,AISI,ASTM,JIS,DIN,API |
Technical | Hot rolled |
Surface | Coated |
Application | Used for bridge and construction riveting, bolted and welded structure, as well as general purpose structural steel quality of carbon steel, steel plate and bar steel. |
Place of origin | Tianjin,China |
Certification | API,CE,ISO,SGS |
Payment | T/T , L/C , Western Union |
Packing | 1.In bundles 2.Standard export packing 3.According to customer's requirements. |
Delivery detail | Normally 1 working days after get deposits or according to quantity |
Advantage | 1. Reasonable price with excellent quality 2. Abundant stock and prompt delivery 3. Rich supply and export experience, sincere service |
MOQ | 1 piece |
1. Steel coils picture for details:
2.Shipment and packing:
3. Our factory:
4.Our certificate:
5.Related production:
(1)Cold rolled steel coils cut to plate
Thickness: 0.5mm-3.0mm width: 800mm/1250mm
(2)Galvanized steel plate
Galvanized steel coils cut to plate
Thickness: 0.1mm-2.5mm width: 600mm/800mm/1250mm
(3) Al-zinc coils and plate
(4)Seamless steel pipe, seamless steel tube, seamless pipe, Hollow bar sizes: outer diameter: 8mm-800mm, wall thickness: 1mm-80mm
(5) Round bar
Material: S235JR, 1045, 1018, 1518, 1020, 41040, 4340, 8620 and other materials
Diameters: 3mm- 800mm
(6)steel profile
angle bar; channel bar; h beam; rectangular tubes
6.steel plate cutting and processing:
1. How long can make delivery?
For stock products, will make shipments in 5- 7 days after receiving deposit or receiving L/C; for products need new production for common materials, usually make shipments in 15-20 days; for products need new production for special and rare materials, usually need 30-40 days to make shipment.
2. Will the Test Certificate be certified to EN10204 3.1?
For the new production products no need furthur cutting or processing, will provide the Original Mill Test Certificate certified to EN10204 3.1; for the stock products and the products need cutting or furthur processing, will issue Certificate of Quality on our Company, It will show the original mill name and the original datas.
3. Once the received products found not comply with the products the contract demands, what will you do?
Once the received products found not comply with the products the contract lists, when receiving the pictures and the official documents and data from your side, if it is proved not comply, we will compensate the loss at first time.
Low alloy hot rolled s235jr en 10025 s335j2 n steel plate