Goat cutting machine,meat cutter
USD $2,000 - $6,500 /Piece
Min.Order:1 Piece
Goat cutting machine,meat cutter
Goat cutting machine,meat cutter
1.The machine can processing a variety of raw meat, vegetables and fruits, with cutting, cutting, cutting, cutting function.
2.Convenient operation, reasonable design, adjustable cutting speed and automatic pre compression system to ensure meat 6 surface accuracy.
3. Before cutting the maximum compression products, cutting speed is 50-120 / min.
4. The compression machine structure saves space, and the machine parts can be easily removed, so that the residues in the gap of the cleaning machine can be easily removed.
5. Adjusting thickness-cutting knob can carry out step less speed regulation of push rod so as to meet the requirement of different cutting thickness
6. Apply to meat processing equipment, frozen meat equipment, canteen and Catering industry.
Parameters,
Model | WT-350 | WT-550 |
Output | 500-600(kg/hour) | 700-900(kg/hour) |
Maximum loading length | 350 mm | 550mm |
Cutting gate size Customizable. | 5,6,7,8,9,11,13,16,20,27 | 5,6,7,8,9,11,14,16,19 |
Cutting slot size (mm) | 84*84*350 | 120*120*550 |
Power(kw) | 2.25 | 3.7 |
Dimension(mm) | 1330*700*935 | 1940*980*1100 |
Weight(kg) | About300 | About400 |
Payment Terms:T/T L/C Western Union D/P D/A Escow Paypal
Packing: wooden box free of fumigation for Beef cutting machine,meat cutter with low price
Quality Guarantee: Our Quality guarantee term is for one year, Malfunctions which are caused by operation mistakenly will be responsible for customers
1 Quality guarantee
2 Pre-Testing before forwarding
3 Operation Video and instruction
4 Full Technical service
1 Manufacturer for Beef cutting machine,meat cutter with low price
2 Alibaba Assessed Gold Supplier
3 100% Quality control before forwarding
4 Competitive price withe best quality and service
1 Are you manufacturer
Yes we are the manufacturer and welcome to visit our factory
2 Can you change the machine voltage as our request
Yes we can change the machine voltage as customers’ request
3 How about your after-sale service
Our engineer can go outside to install and train your workers to operate the full machine line
4 Warranty time of your machine
2 years warranty time except for consumable spare parts
5 How about delivery time of your machine
Generally it needs 5-7 days, for big machines or producing line, it will be much longer but within our negotiated delivery time