Peanut grading sorting shelling machine
USD $2,000 - $3,600 /Set
Min.Order:1 Set
sorting equipment automatic macadamia nuts soybean sorting machine
sieving machine price small pistachio cashew nut almond sorting machine
soybean grading and sorting machine industrial almond sieving machine
sorting machine for beans automatic groundnut beans peanut sieving machine
small vibrating screening machine industrial cashew sorting machine
1.Description of the nut grading machine:
This machine can be used to grade nut kernels by increasing the number of sieve layers.The vibrating screen separators can be equipped with 2-5 layers .
The vibrating screens of different specifications can according to different requirement to achieve different screening purposes.
One machine can meet the separation requirements of nuts in the whole nuts production line.
This machine is also suitable for classify almond ,walnut, hazelnut kernels, peanut,cashew nut,macadamia nuts, soybean, broad beans, etc.
2.Features of the nut grading machine:
1) continuously feeding
2) automatically graded
3) operation simple
4) high production capacity
3.Parameters of the nut grading machine:
Model | Capacity | Weight | Voltage | Power | Size |
TZ-500 | 500-600kg/h | 300kg | 380v | 1.1kw | 2300*800*1360mm |
4.Pictures of the nut grading machine:
5.Why choose us:
1)Professional factory with more than 10 years business experience.
2)Factory area is 5,000 square meters and complete facilities.
3)Strict quality inspection department controls the quality of products.
4)Delivery within 5-10days,one year warranty.
5)Professional after-sales team to solve your problem.
6.Our other machine :
https://zztaizy.en.china.cn/
If you are interested in our machine or would like to know more
information, please contact with us now.
We are looking forward to cooperating with you.
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-7 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.