high efficiency Soybean sheller green soybean sheller
USD $600 - $1,970 /Set
Min.Order:1 Set
Meat Brine Injector Machine Co., Ltd
high efficiency Soybean sheller green soybean sheller
Product details:
The green bean sheller apply flexible clamping and differential break principle to shelling the green beans. The interval between the rollers is adjustable from 0.7--1.2 mm, it get used to different variety of beans.
The voltage is 220v, easy to fulfill. It can process 150kg green bean per hour, the working efficiency is equivalent to 60 times or labour. The compact structure make it stable working and high working efficiency.
Suitable for large quick-frozen food factory, shell speed,midway is not plug material, and lower breakage, power also supply for 380 V, blunt water and dry strip.
Product parameters:
Model | TZ-01M | TZ-02M | TZ-03M | TZ-04M |
Power | 1.75kw | 0.8kw | 1.75kw | 2.25kw |
Rotating speed | 1400 rpm/min | 1400 rpm/min | 1400 rpm/min | 1400 rpm/min |
Weight | 46.5kg | 53kg | 98kg | 102kg |
Dimensions(mm) | 850*420*720 | 1000*520*800 | 1100*660*750 | 1100*660*750 |
Capacity | 50kg/h | 100kg/h | 200kg/h | 300kg/h |
Damage rate | <3% | <3% | <3% | <3% |
Product Features:
1.durable
2.widely suitable
pact structure
4.it is automatic
5.high performance
6.high capacity.
1. Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
2. If we have problems when using this machine, what should we do?
If you have any problem, just contact us, we will help you to solve it, and if necessary, we will arrange our engineers to help you in your country.
3. How about your online service?
24 hours online to solve any problem. Your email will be reply as soon as possible. Your satisfy is our pursuit. Sincerely hope our cooperation .
4. What about the shipping methods?
For urgent order and light weight, you can choose express: FEDEX, TNT, DHL or EMS; for heavy weight, you can choose by air or by sea to save cost.
5. How long does the whole procedure being worked out?
After you place a order, the whole time is about 20-45 days. We need 5-7 days to prepare all the stuff, and the specific time is according to the destination requested by the customer.
We provide technology consultation.
We provide details design of your factory.
We supply spare parts for long time.
We provide 24-hour service.
Packing:
Standard package or as customer's need.
Shipping:
By sea, by air or by international courier.
Delivery time:
Within 3-7 days after formal order and payment.
If you need this machine,please contact us,I am always answer your questions at any time.