mill colloid peanut butter colloid mill machine
USD $700 - $700 /Set
Min.Order:1 Set
Meat Brine Injector Machine Co., Ltd
Peanut butter Colloid mill machine
Descriptions of peanut butter colloid mill machine :
It is widely used in chemcial,food ,medical industry and other industies.It can crush,emulsify, homogenate and mix the semi-liquid and milkiness material such as:
1> Food industry:aloe,pineapple,carrot,friut tea,friut juice,friutjam,corn,peanut butter,sesame soy,spices and so on
2> Chemical industry:paint,dye,lubrication oil, dope and so on
3> Daily commodity:toothpaste,syrup,pollen and so on
Parameters of peanut butter colloid mill machine :
Model | TZ-50 | TZ-80 | TZ-130 | TZ-180 | SL-240 |
Output size | 2----50 Micro | 2----50 Micro | 2----50 Micro | 2----50 Micro | 2----50 Micro |
Capacity | 5-30kg/h | 30-40kg/h | 200-250kg/h | 400-450kg/h | 1000-1500kg/h |
Power | 1.1kw, 220v/380v | 4kw, 380v,50hz | 15kw, 380v,50hz | 22kw, 380v,50hz | 37kw, 380v,50hz |
Die of rotor | 50mm | 80mm | 130mm | 180mm | 240mm |
Size (mm) | 520* 250*555 | 685* 335*928 | 975* 456*1054 | 981* 471*1124 | 1319* 500*1276 |
Weight (kg) | 80 | 210 | 400 | 420 | 1300 |
More pictures of peanut butter colloid mill machine :
1. Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.
2. If we have problems when using this machine, what should we do?
If you have any problem, just contact us, we will help you to solve it, and if necessary, we will arrange our engineers to help you in your country.
3. How about your online service?
24 hours online to solve any problem. Your email will be reply as soon as possible. Your satisfy is our pursuit. Sincerely hope our cooperation .
4. What about the shipping methods?
For urgent order and light weight, you can choose express: FEDEX, TNT, DHL or EMS; for heavy weight, you can choose by air or by sea to save cost.
5. How long does the whole procedure being worked out?
After you place a order, the whole time is about 20-45 days. We need 5-7 days to prepare all the stuff, and the specific time is according to the destination requested by the customer.
We provide technology consultation.
We provide details design of your factory.
We supply spare parts for long time.
We provide 24-hour service.
Packing:
Standard package or as customer's need.
Shipping:
By sea, by air or by international courier.
Delivery time:
Within 3-7 days after formal order and payment.
Any questions,please talk with me as follows: