Low Price GGBS Production Line Factory in SAUDI ARABIA
USD $1000 - $23000 /Set
Min.Order:1 Set
Henan Zhengzhou Mining Machinery CO.Ltd
Blast Furnace Slag Capacity:1.5-25(t/h)
Cement Capacity:3-50(t/h)
Raw Material Capacity:6-110(t/h)
OUR ADVANTAGE
1. Comprehensive service
We ZK company is the professional slag powder production line supplier. We can provide both ball mill and vertical mill production process, while providing 'turnkey' service from civil engineering to commissioning.
2. Serious Quality Control
ZKCorp has a strong capacity of manufacturing and could control product quality seriously with short delivery time. Expert Installation and After-service Team could ensure to finish plant installation and start running on time
3. Low cost and proper investment.
Slag Vertical Mill Production Line from ZKCorp engages the advantages of simple process flow, high-efficiency of grinding, great drying capacity, efficient Powder-classifying, easily-adjustable outputting size, low noise and electricity-consumption, small mill consumption, high degree of automation, low running expense, which make it suitable for small and middle plant owner.
PRODUCTION PROCESS BY VERTICAL MILL
Slag is transported into the plant by truck and stored under the shed. After reclaiming by loader and metering by feeder, the material is delivered and de-ironed into the vertical mill by the belt conveyor and its magnetic separator.
After de-ironing the slag enter the vertical mill for grinding. Dried and grinded slag powder is collected by the separator and sent into the finished product silo by air chute and bucket elevator. The discharged slag is sent back to the mill by conveyor and elevator. The drying heat source is provided by an air heating furnace.
Vertical Mill Configuration Table
小时产量(t/h)闭路 | 年产量(×10kt/a) | 立磨型号 | 磨盘直径 | 立磨电机功率(kW) | |||||
高炉矿渣 | 水泥 | 生料 | 高炉矿渣 | 水泥 | 生料 | 直径 | 中径 | ||
1.5~2 | 3~4 | 6~8 | 1.5 | 3 | 5.5 | ZKRM08.2 | 1200 | 800 | 55 |
3~4 | 5~6 | 10~12 | 3 | 4.5 | 9 | ZKRM11.2 | 1500 | 1100 | 110 |
8~9 | 11~13 | 20~22 | 6 | 9.5 | 17 | ZKRM13.2 | 1700 | 1300 | 185 |
9~10 | 14~16 | 26~34 | 8 | 12 | 24 | ZKRM15.2 | 1900 | 1500 | 250 |
12~14 | 20~23 | 40~50 | 10 | 17 | 36 | ZKRM17.2 | 2100 | 1700 | 355 |
15~17 | 24~26 | 50~60 | 13 | 20 | 43.5 | ZKRM19.2 | 2300 | 1900 | 450 |
18~20 | 27~30 | 60~75 | 15 | 22.5 | 55 | ZKRM20.2 | 2400 | 2000 | 560 |
23~25 | 40~50 | 85~110 | 20 | 35.5 | 77 | ZKRM22.3 | 2600 | 2200 | 710 |
PRODUCTION PROCESS BY BALL MILL
Slag is transported into the plant by truck and stored under the shed. After reclaiming by loader and metering by feeder, the material is delivered into the dryer by belt conveyor for drying. After drying the slag enter the ball mill for grinding. Grinded slag powder is send into the separator by the bucket elevator for grading. Qualified power is sent into the finished product silo by air chute, hoist and elevator. Large particle powders return to ball mill for re-grinding. There is the dust filter at the discharge end of the ball mill. The slag dust is collected and transported into the finished product silo. The drying heat source is provided by an air heating furnace.
Ball Mill Configuration Table
小时产量(t/h) | 年产量(×10kt/a) | 球磨机 | 选粉机 | 球磨机电机功率(kW) | ||||
高炉矿渣 | 水泥 | 生料 | 高炉矿渣 | 水泥 | 生料 | |||
1.5~2 | 3~4 | 6~8 | 1.5 | 3 | 5.5 | φ1.2×4.5m | NHX200 | 55 |
3~4 | 5~6 | 10~12 | 3 | 4.5 | 9 | φ1.5×5.7m | NHX300 | 130 |
8~9 | 11~13 | 20~22 | 6 | 9.5 | 17 | φ2.2×9m | NHX400 | 475 |
9~10 | 14~16 | 26~34 | 8 | 12 | 24 | φ2.2×11m | NHX400 | 570 |
12~14 | 20~23 | 40~50 | 10 | 17 | 36 | φ2.4×11m | NHX500 | 630 |
15~17 | 24~26 | 50~60 | 13 | 20 | 43.5 | φ2.4×13m | NHX500 | 800 |
18~20 | 27~30 | 60~75 | 15 | 22.5 | 55 | φ2.6×10m | NHX600 | 1000 |
23~25 | 40~50 | 85~110 | 20 | 35.5 | 77 | φ3.0×11m | NHX700 | 1250 |