River Boats for sand /Mud Dredging
USD $1,600,000 - $2,000,000 /Set
Min.Order:1 Set
1. River boats for sand/mud dredging
Specifications
Name | HLC500 river boats for sand/mud dredging | ||
Type | Cutter suction dredger | ||
Year | 2013 | ||
Dimensions | |||
Dredger after assembly | Length* width* depth 31*9.3*2.75m | ||
Engine room pontoon | Length* width* depth 18.15*3.7*2.75m | ||
Side pontoon | Length* width* depth 28*2.75*2.75m | ||
Structure | Can be dismantle and assemble at working site | ||
Max. dredging depth | 16m | ||
Discharge distance | 2000 m | ||
Average draught | 1.7m | ||
Diameter suction pipe | 650mm | ||
Diameter discharge pipe | 500mm | ||
Working capacity | 1000 m3/h | ||
Water flow | 5000 m3/h | ||
Main engine power | 1740kw MWM engine TBD620V16 | ||
Auxiliary engine power | 447kw Cummins engine KTA19-M3 | ||
Hydraulic winch | 240 kn | ||
Hydraulic cutter power | 300 kw | ||
Diameter spud cylinder | 160 mm | ||
Emergency genset power | 30GP Cummins | ||
Max. oil consumption | 469L/H |
Hydraulic system
The most important parts of cutter suction dredger and wheel bucket dredger. The hydraulic system requirements are very high and strict; it’s the main artery of the entire dredger. Lateral traction winches, lifting winch and cutter head of the dredgers are driven by hydraulic motors.
An integral hydraulic system includes hydraulic oil tanks, hydraulic pump, hydraulic valve manifold, solenoid valve, hydraulic pipes, hydraulic components, electrical actuator and so on.
2. company view
Factory images
We have two factories. Totally 30,000 square meters. One is located in Binhai Economy Development Zone, the other is in Qingzhou Economy Development Zone. Specially, Qingzhou Factory is noted for hydraulic system and bucket chain sand dredger; Weifang Factory is mainly for cutter suction dredger painting, assemble, testing and dismantle for shipping.
We have working site at home and abroad. Now there are products in stock, welcome customers to visit and have a cooperation.
Testing center for 8m depth
3. Workshop
Blanking workshop Gold panning machinery processing workshop
Machining workshop Anti-corrosion workshop
General assembly workshop Testing center before ex-factory
Painting workshop Dismantle workshop
4. Shipping
Shipping to the Tianjin Port
Our dredger will be dismantle for different parts and then shipping to the port. The dismantle structrue is convenient for transport in the working process if in different working sites.
5. Assembly
Assembly & Staff Training
Our experienced installers will arrive at the construction site to guide, teach and training your staff to debug and operate the dredger until they can operate skillfully by themselves.
6. Working site
7. Visiting and cooperation
Welcome to visit our company, we can talk more details on quality, price and service
8. Cooperation
With high quality and competitve price , we win the trust of the customers'.
Innovation Development Profession Integrity
Hope we can work together on the dredge project