Product Details

On Dry Land Gold Dredging Boat

Brand Name HighLing dredger
Place of Origin Shandong, China
Model Number HLC-T200
Type Gold Panning Dredger, Gold panning dredger
Condition New

Product Features

 1.The instrduction of this production:

 

  The devices include dry and wet screening sand and extracting gold devices.We design the operating manner of the whole set of the equipment according to the geographic conditions the customers supply. The device is fixed with controlling cabinet,genset,material feeding device,sand and stone separating device,waste stone transporting,high pressure injection,metal extracting device,waste material discharging device.The process is to drive to transport and feed material by power. The selected stones are discharged by the chute or transported by belts.The refined sand goes to the heavy metal extracting device passing by the sand sliding board to separate. The waste ore is transported by transporting pump (transporting belts) far away. The device can recycle yellow sand and stone at the same time besides heavy metal. The disposal ability are 50m3/h,80m3/h,100m3/h,150m3/h,200m3/h.We can design and produce the sizes according to the transporting conditions,terrain of the working site and the treatment capacity.

 

2.The products images:

 Our products image:

 On Dry Land Gold Dredging Boat

Our other products:

Hydraulic cutter suction dredger

On Dry Land Gold Dredging Boat

3.Spares:

On Dry Land Gold Dredging Boat

The technical specification list for your reference

NameFull sets of gold mining equipments
TypeGold mining equipment on dry land
ItemSpecifications for main structure
Capacity40--400 m³/h
Equipments for gold extractinggold centrifugal machine/jig/agitating chute
Power kwaccording to conditions of working environments and customer’s requirement

4.Installation site:

:On Dry Land Gold Dredging Boat

              Installation

  Responsibility for the seller

  The seller shall provide technical personnel who are skilled and experienced in their respective callings        and help installation for the work at hand.

  Engineers for helping installation and debugging

  The seller shall provide two engineers on the site in the execution of the training works for skilled, semi-skilled and unskilled workers of the buyer

  The buyer shall be responsible for the recruitment, transportation, accommodation, and medical care and catering of all labor, local or expatriate, and for all payments in connection therewith. 

5.Work shop:

On Dry Land Gold Dredging Boat

            Weifang Hailingdredger Co.,Ltd

       

        1.     Blanking workshop

        2.     Gold panning machinery processing workshop

        3.     Machining workshop

        4.     Anti-corrosion workshop

        5.     General assembly workshop

        6.     Testing center before ex-factory

        7.     Painting workshop

        8.     Dismantle workshop

6.Our company and testing pools:

On Dry Land Gold Dredging Boat

Factory images.

We have two factories. Totally 30,000 square meters. One is located in Binhai Economy

Development Zone, the other is in Qingzhou Economy Development Zone. Specially,

Qingzhou Factory is noted for hydraulic system and bucket chain sand dredger;

Weifang Factory is mainly for cutter suction dredger painting, assemble, testing

and dismantle for shipping.

We have working site at home and abroad. Now there are products in stock, welcome

customers to visit and have a cooperation.

On Dry Land Gold Dredging Boat

 7.Transportation: 

On Dry Land Gold Dredging Boat

                          Shipping to the Qingdao Port.

Our dredger will be dismantle for different parts and then shipping to the port. The dismantle

structrue is convenient for transport in the working process if in different working sites.

8.Clients' visiting and cooperation:

On Dry Land Gold Dredging Boat

 

Weifang Hailing dredger co.Ltd

  1. 1.     Located in Weifang City,Shandong
  2. 2.     9 workshops
  3. 3.     ONE office building for sales department
  4. 4.     Established in 2011,expansion for mass production compare to Haiyang
  5. 5.     Dredger producting ,assemble,testing and dismantle for shiping center.
  6. 6.     15000 square meter for workers recreation
  7. 7.     Testing center for 8mdepth
  8. 8.     Near to Weifang Port

On Dry Land Gold Dredging Boat

 

On Dry Land Gold Dredging Boat

 The second cooperation witn Benins

On Dry Land Gold Dredging Boat

                                                   Note

All necessory tools, tackles, plants and machineries required for the installation, testing and commissioning of silt dredging equipment shall be in the scope of the buyer.

 It is the responsibility of the buyer to store of the material at appropriate locations at their own cost if required. However, storage site shall be provided by the buyer.

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now